Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03464
StatusIssued
Name IVY DESIGNS LLC
Site Address 4015 N DELMONTE DR
Project NameDelmonte Remodel
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION - updates to structural engineering 12-1-19 JJN** Permit for a remodel, to include: demolition of part of existing house, house will now be 933 sq ft, existing 724 sq ft basement will remain. Two new exterior walls at kitchen and greatroom. Includes interior remodel. - All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Change Expiration Date Only  5/27/2020 DONE
DetailsJason Blais
A 180 day extension is approved for an issued permit. This is the first extension request.
BLD-Aging Inspection4/16/20204/16/20204/20/2020 PEND
DetailsTell Riley
BLD-Aging Inspection4/15/20204/15/20204/16/2020 PEND
DetailsTell Riley
no inspections requested since December
BLD-Wall Bracing12/3/201912/3/201912/3/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by greg bauer
BLD-Wall Bracing12/2/201912/2/201912/2/2019PFAIL
DetailsTell Riley
Greg Phone #: ###-####//add blocking and nails shear locations at plate per plan detail//add HDU 2 and install per manufacturers installation instructions//framing cannot be passed until trades rough ins complete and inspected//
BLD-Framing/Rough-in12/2/201912/2/201912/2/2019PCANC
DetailsTell Riley
Greg Phone #: ###-####//no trades complete//needs shear inspection//will schedule for shear//
Plan assigned to (J_N)11/25/201911/25/201912/2/2019 DONE
DetailsJenny Nelson
plan mod: structural changes to framing
Routing - PLAN CHECK12/2/2019 12/2/2019 PASS
DetailsJenny Nelson
Plan modification - structural engineering updated
Permit Ready to Issue  12/2/2019 DONE
**DO NOT REISSUE - PLAN MOD**
CHANGE STATUS TO (ISS)  12/2/2019 DONE
BLD-Framing/Rough-in11/23/201911/25/201911/25/2019AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by greg bauer//need to submit for plan mod for change at front entry and shear changes from engineer//
Plan Modification Accepted  11/25/2019 DONE
plan mod
BLD-Framing/Rough-in11/11/201911/12/201911/12/2019AFAIL
DetailsTell Riley
Rough framing/Sheer wall inspection to allow us to cover with house wrap. Phone #: ###-#### Inspection requested via web by greg bauer//no plans onsite///please have plans located onsite for all inspections//
BLD-Wall Bracing11/4/201911/5/201911/5/2019PDONE
DetailsTell Riley
Do you need to see the installation of threaded anchor bolts drilled and epoxy into existing concrete wall for residential project? I know for commercial you have see this being done Phone #: ###-#### Inspection requested via web by greg bauer//answered questiosn//
BLD-Footing10/6/201910/7/201910/7/2019APASS
DetailsTell Riley
Post Footing and west basement wall extension. Phone #: ###-#### Inspection requested via web by greg bauer//post footing ok per plans//
Routing Walk-In (BLD)9/6/20199/6/20199/6/2019AFAIL
DetailsJosh Bogle
Routing Walk-In (BLD)9/6/20199/6/20199/6/2019PPASS
DetailsJenny Nelson
Inspection Record Card- Bld  9/6/2019 DONE
DetailsJenny Nelson
Case Summary (BLD)  9/6/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  9/6/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  9/6/2019 DONE
Issue PAID IN FULL permit  9/6/2019 DONE
Routing - PLAN CHECK9/6/2019 9/6/2019 FAIL
DetailsJosh Bogle
plans incomplete
1st review completed  9/6/2019 FAIL
DetailsJosh Bogle
Application received 9/6/2019