Permit NumberBLD19-03468
StatusFinaled
Name JRG CONSTRUCTION
Site Address 121 N 9TH ST Unit: 300
Project NameTomlinson 3rd Floor T.I.
Customer Number 
ePlanReviewYes
Description
(TOMLINSON - PLAZA 121 BUILDING - 3RD FLOOR) Permit to remodel an existing 12,305 sq.ft. office space. Work to include: Minor demolition, construct non-load bearing interior walls, doors, millwork, accessible reception counter, and minor electrical work. This building is fire sprinkled in lieu of opening protection at the alley, rated corridors, basement enclosure, elevator lobbies, etc. It is also fire sprinkled because it has occupied floors more than 55 feet above the sidewalk and to allow one stairway to egress through a nonrated lobby on the 1st floor. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/10/20203/12/2020 DONE
This permit finaled on the web by Richard Tomlinson
Third Notice 2/12/20203/5/2020 DONE
mailed 3-6-20
Second Notice 1/9/20202/7/2020 DONE
mailed 2-10-20
First Notice 12/2/201912/30/2019 DONE
mailed 1-1-20
BLD-Final11/21/201911/22/201911/22/2019APASS
DetailsDave Hannah
David Phone #: ###-####
Permanent Occupancy  11/22/2019 DONE
FIRE-Final Inspection11/19/201911/21/201911/21/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit card for associated trades.

David Phone #: ###-####
BLD-Conference11/14/201911/15/201911/15/2019ADONE
DetailsDave Hannah
dAVID Phone #: ###-####
BLD-Framing/Rough-in10/17/201910/17/201910/17/2019PPART
DetailsBrandon Shaw
Ok to cover pending ELE cover approval...
Issue PAID IN FULL permit  10/1/2019 DONE
Print Occupancy Form  10/1/2019 DONE
Plan assigned to (M_H)9/18/2019 9/27/2019 DONE
DetailsMichael Hanson
09/27 #518 L2 ePlan - Tomlinson 3rd Floor T.I.
Routing - PLAN CHECK9/18/2019 9/27/2019 PASS
DetailsMichael Hanson
Routing - Addressing9/18/2019 9/27/2019 PASS
DetailsDoug Chausow
Per approval in ePlan.
1st review completed  9/27/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  9/27/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  9/27/2019 DONE
MET KALYN@COLEARCHITECTS.NET
need GC
Need rev cert of val
Routing - PUBLIC WORKS9/18/2019 9/19/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Intake Approval  9/18/2019 PASS
DetailsJavier Guzman
Application received  9/6/2019 DONE