BLD-Concrete | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PART |
Tony Young
|
|
|
screened // Austin Phone #: ###-####// upper foundation wall
|
BLD-Conference | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Tony Young
|
|
|
want to discuss entry stairs and confirm framer fixes are acceptable Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Concrete | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Tony Young
|
|
|
screened - rebar // Austin Phone #: ###-#### upper footings ok,, soils ok via e-mail
|
BLD-Energy code compliance | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Tony Young
|
|
|
wall insulation in, would like to sheetrock Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Wall cover | 4/19/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Tony Young
|
|
|
Townhome has been airsealed, would like to install wall insulation and sheetrock Phone #: ###-#### Inspection requested via web by ron beckman// frame ok,, ok to insulate
|
BLD-Energy code compliance | 4/19/2020 | 4/20/2020 | 4/19/2020 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by ron beckman Inspection cancelled from web by: ron beckman
|
BLD-Conference | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PART |
Tony Young
|
|
|
Would like fire wall framer fixes inspected and would like to insulate part of garage ceiling so garage doors can be installed to secure building Phone #: ###-#### Inspection requested via web by ron beckman// ok after sealing gaps in firewall,, ok to insulate garage areas
|
BLD-Wall Bracing | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Dave Hannah
|
|
|
additional hold downs were installed 4/2/2020. Would like to cover exterior walls for stucco prep Phone #: ###-#### Inspection requested via web by ron beckman
|
BLD-Wall Bracing | 3/26/2020 | 3/27/2020 | 3/30/2020 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by ron beckman nailing of pannals ok but hold dows/bolting of portel frame panals not done
|
BLD-Foundation | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Dave Hannah
|
|
|
rebar // Austin Phone #: ###-####
|
BLD-Footing | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | CANC |
Tony Young
|
|
|
austin Phone #: ###-####// wrong permit called in
|
BLD-Wall Bracing | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, upper firewalls ok
|
BLD-Framing/Rough-in | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, pony wall ok to cover
|
BLD-Wall Bracing | 2/18/2020 | 2/18/2020 | 2/19/2020 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####// lower garage firewall ok
|
BLD-Foundation | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, work in progress on upper foundation walls
|
BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PART |
Tony Young
|
|
|
Austin Phone #: ###-####// upper level of home footings
|
BLD-Foundation | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, , work in progress,, ok
|
BLD-Foundation | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PART |
Tell Riley
|
|
|
Austin Phone #: ###-####//garage portion only//ok per plans//discussed cold weather requirements--will get blankets onsite// WIP//footings only//
|
PubWorks Subgrade Approval | 11/8/2019 | 11/8/2019 | 11/8/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Meeting | | | 10/23/2019 | | DONE |
|
|
|
Email was sent to Leon to clarify if all 4 permits needed zoning inspection- per Leon in person conversation, No zonong inpections on none of the permits 19-03485, 19-03484, 19-03483 and 19-03482
|
Issue PAID IN FULL permit | | | 10/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/22/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/18/2019 | 10/18/2019 | 10/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 10/21/2019 | | 10/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/22/2019 | | DONE |
|
|
|
4 TOWNHOMES - ISSUE WITH BLD19-03482, 03484,03485
|
1st review completed | | | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - Erosion and Sediment | 9/26/2019 | | 10/21/2019 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC19-01248 for site
|
Plan assigned to (RDP) | 9/26/2019 | 9/26/2019 | 10/18/2019 | | DEFR |
Rob Patrick
|
|
|
10/15 sfd L2 PAPER
|
Routing - PLAN CHECK | 9/26/2019 | | 10/18/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 9/27/2019 | | 10/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Route to Impact Fee Review | 9/26/2019 | 9/29/2019 | 10/2/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 9/26/2019 | | 10/2/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 9/26/2019 | | 9/30/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 9/26/2019 | 9/26/2019 | 9/27/2019 | | PASS |
Lee G Meredith
|
|
|
Fire code review passed. Sprinklers not required. No comments.
|
Routing - Addressing | 9/26/2019 | | 9/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2019 | | 9/27/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/26/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/26/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2019 | | FAIL |
|
|
|
All floor plans need to match the site plan - site plan shows 2 townhomes offered from the other two.
|
Application received | | | 9/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2019 2:55PM
|