BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Brandon Shaw
|
|
|
Shae *screened* Phone #: ###-####
|
DOC - Permit Finaled | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shea Telford
|
BLD-Framing/Rough-in | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shea Telford
|
BLD-Framing/Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Shea Telford mech not approved
|
BLD-Energy code compliance | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Shea Telford mech not approved
|
BLD-Framing/Rough-in | 3/17/2020 | 3/19/2020 | 3/19/2020 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Shea Telford
|
BLD-Energy code compliance | 3/17/2020 | 3/19/2020 | 3/19/2020 | A | NR |
Dave Hannah
|
|
|
Needing an insulation inspection. Phone #: ###-#### Inspection requested via web by Shea Telford
|
Permit Ready to Issue | | | 1/2/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/2/2020 | | DONE |
|
|
|
had to add permit ready to issue.
|
BLD-Wall Bracing | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Brandon Shaw
|
|
|
First floor only... OK to cover...
|
Plan assigned to (JAB) Josh | 9/9/2019 | 9/9/2019 | 12/5/2019 | | PASS |
Josh Bogle
|
|
|
09/17 ADU, paper - 1st done
|
Routing - PLAN CHECK | 12/5/2019 | | 12/5/2019 | | PASS |
Josh Bogle
|
|
|
waiting on a 2nd copy of the 11-20-2019 engineering
|
Inspection Record Card- Bld | | | 12/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/5/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Routing - PLANNING | 12/5/2019 | | 12/5/2019 | | PASS |
David Moser
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/4/2019 | | DONE |
|
|
|
One copy of Structural Calculations and two copies of plan sheets 001, 201, 601 and 602 taken to Josh
|
Plan resubmittals received | | | 11/25/2019 | | DONE |
|
|
|
Resubmittal of sheets 001,201, 601, 602. 4 copies
|
Routing Walk-In (BLD) | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Josh Bogle
|
|
|
revised drawings and calculations
|
Routing - PLAN CHECK | 11/21/2019 | | 11/21/2019 | | FAIL |
Josh Bogle
|
|
|
stringers overspanned, point load concerns, no engineering for the SIPS
|
Routing - PLAN CHECK | 11/6/2019 | | 11/7/2019 | | FAIL |
Josh Bogle
|
|
|
project being changed to a partial SIPS build - lacks full structural info
|
Routing - MECHANICAL | 10/28/2019 | | 10/28/2019 | | FAIL |
Troy James
|
|
|
Manual j report submitted. Emailed corrections to designer.
|
1st review completed | | | 9/27/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/27/2019 | | 9/27/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Chad
|
Routing - MECHANICAL | | | 9/27/2019 | | PASS |
|
|
|
No manual j report. Builder will install a ductless unit. Mechanical ventilation is required.
|
Route to Impact Fee Review | 9/10/2019 | 9/13/2019 | 9/11/2019 | | PASS |
Shannon Cade
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/9/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/9/2019 | | PASS |
|
|
|
|
Routing - PLANNING | 9/9/2019 | | 9/9/2019 | | FAIL |
David Moser
|
|
|
need a copy of the recorded deed restriction
|
Routing - Addressing | 9/9/2019 | | 9/9/2019 | | PASS |
Doug Chausow
|
|
|
ADU Address: 2010 S Longmont Ave
|
Routing - PUBLIC WORKS | 9/9/2019 | | 9/9/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | 9/9/2019 | | | |
|
|
|
|