Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD19-03506
StatusFinaled
Name HAGEN ERIK R
Site Address 809 N 18TH ST
Project NameHagen Remodel
Customer Number 
ePlanReviewNo
Description
Permit for a full gut-to-the studs remodel that includes: converting the unfinished Basement space to a Laundry Room and Entertainment Room, converting the basement 1/2 bath to a Full Bath, adding a Powder Bath on the main level, opening a portion of the wall between the Kitchen & Dining, and reconfiguring Upstairs space to add a Master Bath. At completion home is 3bd/3.5bth. Window replacement will occur under this permit. All work per plans, notations, attachements, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** Window replacement and resizing of one window on north elevation approved through DRH19-00472. No other exterior modifications proposed or approved. **KEB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/2/20206/2/20206/2/2020PPASS
DetailsTony Young
Erik Phone #: ###-####
DOC - Permit Finaled6/2/20206/2/20206/2/2020PPASS
DetailsTony Young
Zoning Approval6/2/20206/2/20206/2/2020 PASS
DetailsKayCee Babb
Per window material sheet provided by applicant.
BLD-Wall cover3/13/20203/16/20203/16/2020APASS
DetailsBrandon Shaw
Corrections are SAT...
Insulate inspection...
BLD-Final3/10/20203/11/20203/11/2020ACANC
DetailsMike Jordan
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen
BLD-Framing/Rough-in3/11/20203/11/20203/11/2020APART
DetailsMike Jordan
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen. All previous correction items have been repaired. Ok to foam spray exterior walls and under roof deck. Noted several areas that need fireblocked. Contractor noted that he will have these areas addresed for energy code inspection.
BLD-Framing/Rough-in3/10/20203/10/20203/10/2020PPEND
DetailsTony Young
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen/// needs mech. pass 1st,, ok to start spray foaming unaffected areas of mechanical and frame corrections
BLD-Framing/Rough-in3/9/20203/10/20203/10/2020ANR
DetailsTony Young
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen// needs mechanical rough in pass 1st
BLD-Conference3/5/20203/6/20203/5/2020ACANC
DetailsTony Young
Please call 310.755.5987 10 minutes prior to arrival. Preliminary items from Tuesday meeting addressed by framer. Ready for re-inspection of framing in preparation for spray foam insulation next week. Phone #: ###-#### >> Inspection requested via web by Erik Hagen Inspection cancelled from web by: Erik Hagen
BLD-Conference3/3/20203/3/20203/3/2020PPART
DetailsTony Young
Please call Erik @ 310.755.5987 15 minutes in advance so I can be there.
This is for Framing inspection prior to insulating. Phone #: ###-#### Inspection requested via web by Erik Hagen/// frame walk through,, fire blocking,, joist connections,, header support,, trades,, etc.
BLD-Footing1/20/20201/21/20201/21/2020APART
DetailsTony Young
Second set of rebar for footings. Contractor (Alex Katan) will be on site. Phone #: ###-#### Inspection requested via web by Erik Hagen// work in progress,, ok
BLD-Footing1/15/20201/16/20201/16/2020APART
DetailsDave Hannah
Please call 15 minutes prior so that we can ensure access and that we will be there.
Rebar for footings again. They had the rebar in place today. The contractor will be there tomorrow morning 1/16 as well to go over their process as the concrete will be placed in phases and will affect the rebar placement. Phone #: ###-#### Inspection requested via web by Erik Hagen first set of ftgs under ext basement walls ok
BLD-Footing1/13/20201/14/20201/14/2020ANR
DetailsDave Hannah
Rebar rescheduled from Monday. Call me before. Phone #: ###-#### Inspection requested via web by Erik Hagen
BLD-Footing1/10/20201/13/20201/13/2020PCANC
DetailsTony Young
Partial rebar install for new basement edge of slab turn up/down under existing stem wall. Phone #: ###-#### >> Inspection requested via web by Erik Hagen Inspection cancelled from web by: Erik Hagen
BLD-Conference11/12/201911/13/201911/13/2019APART
DetailsTony Young
Haygen- please call before Phone #: ###-####,, ?s about basement slab.. walls without footings,, need to have engineer design or approve of a fix..
BLD-Final10/25/201910/28/201910/28/2019ACANC
DetailsDave Hannah
call to meet // Erik Phone #: ###-####
Routing Walk-In (Zoning)10/17/201910/17/201910/17/2019PPASS
DetailsKayCee Babb
Window replacement and resizing of one window on north elevation approved under DRH19-00472. No other exterior alterations proposed or approved.
Routing Walk-In (BLD)10/17/201910/17/201910/17/2019PDONE
DetailsJosh Bogle
Routing Walk-In (BLD)10/16/201910/16/201910/17/2019PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK10/17/2019 10/17/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  10/17/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/17/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/17/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  10/17/2019 DONE
Issue PAID IN FULL permit  10/17/2019 DONE
Routing Walk-In (BLD)9/9/20199/9/20199/9/2019PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK9/9/2019 9/9/2019 FAIL
DetailsJosh Bogle
missing some structural details and Man J
1st review completed  9/9/2019 FAIL
DetailsJosh Bogle
Application received 9/9/2019