BLD-Foundation | 2/27/2020 | 3/2/2020 | 3/2/2020 | P | PART |
Tony Young
|
|
|
Call PJ Smith w any questions. 208 559 0588 Phone #: ###-#### Inspection requested via web by PJ Smith// work in progress,, ok
|
BLD-Footing | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Tony Young
|
|
|
Call PJ Smith w questions 208 559 0588
Phone #: ###-#### Inspection requested via web by PJ Smith,, house footings ok
|
PubWorks Subgrade Approval | 2/18/2020 | 2/18/2020 | 2/18/2020 | | DONE |
Melissa Jannusch
|
|
|
MAIN AND LOWER LEVEL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | CANC |
Tony Young
|
|
|
PJ Phone #: ###-####
|
BLD-Footing | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PART |
Tony Young
|
|
|
Please call PJ Smith before going to inspection 208 559 0588 Thanks! Phone #: ###-#### Inspection requested via web by PJ Smith// lower south section ok per soils approval
|
PubWorks Subgrade Approval | 12/18/2019 | 12/18/2019 | 12/18/2019 | | DONE |
Melissa Jannusch
|
|
|
LOWER LEVEL SOUTH HALF ONLY.A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/8/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/8/2019 | 11/8/2019 | 11/8/2019 | | DONE |
Jenny Nelson
|
|
|
|
Plan assigned to (RDP) | 9/10/2019 | 9/10/2019 | 11/8/2019 | | DEFR |
Rob Patrick
|
|
|
09/27 sfd L2 PAPER...10/14 Delivered to Erosion
|
Routing - PLAN CHECK | | | 11/8/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 11/8/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 11/8/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2019 | | DONE |
|
|
|
Spoke with PJ informing him that this permit is ready and the fee amount due
|
Routing - FIRE | 10/17/2019 | | 10/21/2019 | | PASS |
Lee G Meredith
|
|
|
09/23-4265 N Eyrie Way Residential Paper 404 LGM
Sprinklers are not requred.
|
Routing - Erosion and Sediment | 9/23/2019 | | 10/17/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Plan Reviewer's activity | | | 10/14/2019 | | |
|
|
|
Delivered entire package to Erosion for their revview.
|
Routing - MECHANICAL | 9/23/2019 | | 9/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/23/2019 | | 9/23/2019 | | PASS |
Sue Cummings
|
|
|
See driveway redlines
|
Routing - PUBLIC WORKS | 9/10/2019 | | 9/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 9/11/2019 | | 9/19/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 9/10/2019 | 9/13/2019 | 9/11/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/10/2019 | | 9/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/10/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/10/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/10/2019 | | PASS |
|
|
|
|
Application received | | 9/10/2019 | | | |
|
|
|
|