BLD-Final | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Jim Storey
|
|
|
john Phone #: ###-#### per the reviewed plan.
|
DOC - Permit Finaled | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work is complete, signature card not available at time of inspection.
|
Fees Due Hold | 12/6/2019 | | 3/26/2020 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 12/5/2019 | | 12/5/2019 | | DONE |
Judith Amador
|
|
|
|
Routing - FIRE | 11/21/2019 | 11/21/2019 | 12/4/2019 | | PASS |
Erika Akin
|
|
|
Rerouted to fire with additional information received from Micron regarding chemicals on loading dock. According to Paul Marcolina and Michelle Leonard at Micron, the loading dock is for chemical offloading. No chemicals are stored on the dock. Chemicals are routed into a closed system (DFS equipment) from the truck into the building. According to Micron the only chemical off loaded at this dock is 96% Sulfuric Acid. No increase in previously approved hazardous materials inventory for the structure. Vehicle impact protection may be required. Signage per NFPA 704 hazard required. Inspector to field verify.
|
Plan assigned to (JAR) | 10/21/2019 | 10/21/2019 | 12/4/2019 | | DONE |
Julie Romig
|
|
|
*11/21 - 2nd Rev - 1st Rev Comp - Micron B51 Roof Extension (route to Fire 2nd Rev)
|
Routing - PLAN CHECK | 11/14/2019 | | 12/4/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2019 | | DONE |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
ALL MET
Need GC
Need Revised Value
|
Print Occupancy Form | | | 12/4/2019 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 12/4/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/4/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/4/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/14/2019 | | 11/15/2019 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 11/1/2019 | 11/4/2019 | 11/5/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/1/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 10/11/2019 | | 11/1/2019 | | FAIL |
Julie Romig
|
|
|
CH2M Hill/Jacobs
|
Routing - PLAN CHECK | 10/11/2019 | | 11/1/2019 | | FAIL |
Julie Romig
|
|
|
Need Hazardous Materials Inventory Statement
|
Routing - FIRE | 10/11/2019 | 10/11/2019 | 10/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
11/19 (502) Micron Bldg B-51, ePlan
|
Plan assigned to (CDM) | 10/11/2019 | 10/11/2019 | 10/21/2019 | | DEFR |
Carl D Madsen
|
|
|
Micron Building 51 addition
|
Routing - PLANNING | 10/11/2019 | | 10/16/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - Addressing | 10/11/2019 | | 10/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2019 | | 10/14/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Routing PW Drainage | 10/14/2019 | | 10/14/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 10/11/2019 | | 10/11/2019 | | PASS |
Andy J. Long
|
|
|
Minor TI. No ESC permit required.
|
Routing - Design Review | 10/11/2019 | | 10/11/2019 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 10/9/2019 | | PASS |
|
|
|
|
Intake Approval | | | 9/13/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide or address the following for your Prescreen to be approved;
1. This is new construction and needs to be filed with Form #520. Please provide all the required information as specified by this form.
2. The applicable codes on the cover sheet need to represent the current codes Boise City uses.
3. Form #310 must be signed by Paul.
|
Application received | | | 9/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2019 3:31PM
|