Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03530
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC3228 - B51 Roof Extension
Customer Number 
ePlanReviewYes
Description
(C3228 - MICRON B-51 – LOADING DOCK ROOF EXTENSION) **C3228** Permit to extend the dock roof for the bulk chemical offload stations. The chemicals will be routed in a closed system from the bulk trucks into the building and there will be no chemical storage on the loading dock. Roof extension is located in the northeast corner of the building between gridlines AA.4-BB and 19-20. Work to include: new noncombustible roof and supporting structure. Special inspections required per the attached Form 310. This building is fully fire sprinklered and alarmed for H occupancy. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/26/20203/27/20203/27/2020APASS
DetailsJim Storey
john Phone #: ###-#### per the reviewed plan.
DOC - Permit Finaled3/27/20203/27/20203/27/2020PPASS
DetailsJim Storey
FIRE-Final Inspection3/26/20203/26/20203/26/2020APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work is complete, signature card not available at time of inspection.
Fees Due Hold12/6/2019 3/26/2020 DONE
DetailsBrittany Hill
Fees Due Hold12/5/2019 12/5/2019 DONE
DetailsJudith Amador
Routing - FIRE11/21/201911/21/201912/4/2019 PASS
DetailsErika Akin
Rerouted to fire with additional information received from Micron regarding chemicals on loading dock. According to Paul Marcolina and Michelle Leonard at Micron, the loading dock is for chemical offloading. No chemicals are stored on the dock. Chemicals are routed into a closed system (DFS equipment) from the truck into the building. According to Micron the only chemical off loaded at this dock is 96% Sulfuric Acid. No increase in previously approved hazardous materials inventory for the structure. Vehicle impact protection may be required. Signage per NFPA 704 hazard required. Inspector to field verify.
Plan assigned to (JAR)10/21/201910/21/201912/4/2019 DONE
DetailsJulie Romig
*11/21 - 2nd Rev - 1st Rev Comp - Micron B51 Roof Extension (route to Fire 2nd Rev)
Routing - PLAN CHECK11/14/2019 12/4/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  12/4/2019 DONE
DetailsJulie Romig
Permit Ready to Issue  12/4/2019 DONE
ALL MET
Need GC
Need Revised Value
Print Occupancy Form  12/4/2019 DONE
Issue & PRINT to be Invoiced  12/4/2019 DONE
Print Occupancy Form  12/4/2019 DONE
Print Occupancy Form  12/4/2019 DONE
Routing Off Site - STRUCTURAL11/14/2019 11/15/2019 PASS
DetailsJulie Romig
Route to Impact Fee Review11/1/201911/4/201911/5/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/1/2019 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL10/11/2019 11/1/2019 FAIL
DetailsJulie Romig
CH2M Hill/Jacobs
Routing - PLAN CHECK10/11/2019 11/1/2019 FAIL
DetailsJulie Romig
Need Hazardous Materials Inventory Statement
Routing - FIRE10/11/201910/11/201910/25/2019 PASS
DetailsMark Stumbaugh
11/19 (502) Micron Bldg B-51, ePlan
Plan assigned to (CDM)10/11/201910/11/201910/21/2019 DEFR
DetailsCarl D Madsen
Micron Building 51 addition
Routing - PLANNING10/11/2019 10/16/2019 PASS
DetailsKarla Nelson
Routing - Addressing10/11/2019 10/15/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/11/2019 10/14/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing PW Drainage10/14/2019 10/14/2019 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment10/11/2019 10/11/2019 PASS
DetailsAndy J. Long
Minor TI. No ESC permit required.
Routing - Design Review10/11/2019 10/11/2019 PASS
DetailsJosh Wilson
Intake Approval  10/9/2019 PASS
Intake Approval  9/13/2019 FAIL
DetailsBrian McGowan
Please provide or address the following for your Prescreen to be approved;
1. This is new construction and needs to be filed with Form #520. Please provide all the required information as specified by this form.
2. The applicable codes on the cover sheet need to represent the current codes Boise City uses.
3. Form #310 must be signed by Paul.
Application received  9/10/2019 DONE
Application submitted via PDS Online on Sep 10 2019 3:31PM