BLD-Aging Inspection | 4/2/2020 | 4/2/2020 | 4/9/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Ed Phone #: ###-####//corrections made//shear nailed and stapled//
|
BLD-Framing/Rough-in | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | FAIL |
Tell Riley
|
|
|
Ed Phone #: ###-####//need to add nails for shear or provide staple conversion per engineer//add A35s per notes by engineer//
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | FAIL |
Tell Riley
|
|
|
Ed Phone #: ###-####//remove wrap for shear inspection//expose wall sill plates for anchor bolt inspection//add kings stud per details//add A35 per details//sthd14s needed at all location noted on plans//CN posted//
|
BLD-Footing | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
Ed Phone #: ###-####//ok per approved plans//wall and footing//
|
Routing Walk-In (Zoning) | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/10/2019 | | 9/10/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/10/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/10/2019 | | DONE |
|
|
|
|
Application received | | 9/10/2019 | | | |
|
|
|
|