Letter of compliance/Occupancy | | | 7/21/2020 | | DONE |
|
|
|
|
BLD-Final | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
DOC - Permit Finaled | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | DONE |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds 4.2
|
BLD-Final | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds mech to sign off// blower door test. inside ok.
|
BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Framing/Rough-in | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Storey
|
|
|
c/n made ok
|
BLD-Energy code compliance | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | NR |
Jim Storey
|
|
|
Justin Phone #: ###-#### // need to check 2 locations for framing corections ok to begin sheet rock.301
|
BLD-Energy code compliance | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Jim Storey
|
|
|
Justin Phone #: ###-#### rolled to monday.
|
BLD-Framing/Rough-in | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PART |
Jim Storey
|
|
|
justin Phone #: ###-#### support trusses into 3ply 2nd floor/ mlb hangers under stairs. ok to insulate upon hvac aproval.
|
Routing - MECHANICAL | 2/5/2020 | | 2/5/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PART |
Dave Hannah
|
|
|
JUSTIN Phone #: ###-#### needs to install one hd hold down at garage front and fix two portal frames ok to cover ext
|
BLD-Foundation | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Jim Storey
|
|
|
stem walls // Jose Phone #: ###-####
|
BLD-Footing | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/28/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/21/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 9/11/2019 | 9/11/2019 | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
09/24 sfd L1 ePlan. 1st complete, emergency window, site plan for planning
|
Inspection Record Card- Bld | | | 10/21/2019 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/21/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2019 | | DONE |
|
|
|
Left voicemail for Kristine to inform her the permit is ready and what fees are due.
|
Routing - PLANNING | 10/21/2019 | | 10/21/2019 | | PASS |
Sue Cummings
|
|
|
In the future submit site plans with all black lines rather than light gray
|
Routing - PLAN CHECK | 10/21/2019 | | 10/21/2019 | | PASS |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 10/18/2019 | | DONE |
|
|
|
Two copies of each Site Plan, Main Floorplan and Upper Floor Plan stamped and taken to plan reviewer.
|
Routing - PLAN CHECK | 9/17/2019 | | 9/24/2019 | | FAIL |
Jenny Nelson
|
|
|
Upper bed emergency escape window
|
1st review completed | | | 9/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 9/11/2019 | | 9/17/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/11/2019 | 9/14/2019 | 9/12/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 9/11/2019 | | 9/11/2019 | | FAIL |
Sue Cummings
|
|
|
We need to see concrete and other details on the site plan. The lines are too light.
|
Routing - Addressing | 9/11/2019 | | 9/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/11/2019 | | 9/11/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2019 | | DONE |
|
|
|
|
Application received | | 9/11/2019 | | | |
|
|
|
|