BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Brandon Shaw
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Concrete | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Dave Hannah
|
|
|
rebar- Lance Phone #: ###-####
|
PubWorks Subgrade Approval | 10/1/2019 | 10/1/2019 | 10/1/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 9/26/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/11/2019 | 9/11/2019 | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
09/17 pool, paper
|
Routing - PLAN CHECK | 9/19/2019 | | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
1st review completed | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/24/2019 | | 9/25/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request/no ESC plan submitted. RP needs to be listed in order to issue permit
|
Plan Reviewer's activity | | | 9/24/2019 | | DONE |
Josh Bogle
|
|
|
this reached my desk with no record of ESC sign-off - I routed it **JAB**
|
Routing - PUBLIC WORKS | | | 9/19/2019 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | 9/18/2019 | | 9/18/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - PLANNING | 9/11/2019 | | 9/11/2019 | | PASS |
Jeff Lowe
|
|
|
per CFH19-03557
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2019 | | DONE |
|
|
|
|
Application received | | 9/11/2019 | | | |
|
|
|
|