BLD-Final | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Dave Hannah
|
|
|
Call Mike with questions Phone #: ###-#### Inspection requested via web by Rob Maes
|
DOC - Permit Finaled | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | DEFR |
Jim Storey
|
|
|
Call Mike with questions Phone #: ###-#### Inspection requested via web by Rob Maes// out of time rolled to monday am
|
Permit Ready to Issue | | | 10/23/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 10/23/2019 | | DONE |
|
|
|
Plan mod
|
Plan assigned to (BJM) | 10/7/2019 | 10/7/2019 | 10/22/2019 | | DONE |
Brian McGowan
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 10/7/2019 | | 10/22/2019 | | PASS |
Brian McGowan
|
|
|
|
Plan Modification Accepted | | | 10/7/2019 | | DONE |
|
|
|
plan mod in e plan-Mike Bird asked for plan mod-assigned to Brian McGowan
GF**Plan mod was for change of panel type. Applicant resubmitted a full set that didn't version over. I deleted the old drawings**GF
|
BLD-Final | 9/27/2019 | 10/1/2019 | 10/1/2019 | A | NR |
Brandon Shaw
|
|
|
Need Ele final...
|
Issue PAID IN FULL permit | | | 9/25/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 9/13/2019 | 9/13/2019 | 9/24/2019 | | DONE |
Brian McGowan
|
|
|
09/18 PV, ePlan
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
|
1st review completed | | | 9/20/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/12/2019 | | 9/20/2019 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 9/12/2019 | 9/12/2019 | 9/13/2019 | | DEFR |
Josh Bogle
|
|
|
vacay on the way
|
Application received | | | 9/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 12 2019 11:42AM
|
Intake Approval | | | 9/12/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/12/2019 | | DONE |
|
|
|
no fees paid at intake
|
Routing - PLANNING | 9/12/2019 | | 9/12/2019 | | PASS |
Sue Cummings
|
|
|
|