BLD-Final | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Mike Jordan
|
|
|
screened- Video ok- Stacy Phone #: ###-####
|
DOC - Permit Finaled | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Mike Jordan
|
|
|
Smoke detectors installed. Inspection conducted via google duo.
|
BLD-Final | 5/5/2020 | 5/7/2020 | 5/7/2020 | A | FAIL |
Mike Jordan
|
|
|
Stacy **screened** Video call ok Phone #: ###-####. Needs to provide smoke detector in new bedroom and combo smoke/CO outside of bedroom. Ok for blue tooth/wireless at this location.
|
BLD-Framing/Rough-in | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Tell Riley
|
|
|
stacy Phone #: ###-####
|
BLD-Wall Bracing | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Tell Riley
|
|
|
nailing added at PT plate//hot dipped galvanized nails used//
|
BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | NR |
Tell Riley
|
|
|
Stacy Phone #: ###-####//already insulated-needs plumbing and mechanical isnpection before framing//used r 19 wall and r 30 attic--suggested res check and plan mod for energy//
|
BLD-Wall Bracing | 12/30/2019 | 1/2/2020 | 1/2/2020 | A | NR |
Tell Riley
|
|
|
Stacy Phone #: ###-####//used as conference, need to add nails at sill plate//discussed window framing with headers//
|
BLD-Foundation | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Tell Riley
|
|
|
Stacy Phone #: ###-####
|
BLD-Foundation | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tell Riley
|
|
|
call when you are on your way- Stacy Phone #: ###-####//ok--discussed adding ufer ground for new electrical service//
|
Routing Walk-In (Zoning) | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/13/2019 | | 9/13/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/13/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/13/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2019 | | DONE |
|
|
|
|
Application received | | 9/13/2019 | | | |
|
|
|
|