Permanent Occupancy | | | 10/25/2019 | | DONE |
|
|
|
|
BLD-Final | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Tell Riley
|
|
|
Steve Phone #: ###-####//items required on application have been met//no changes have been done on tennant space//space was unfurnished at time of inspection//
|
FIRE-Final Inspection | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Tim Phone #: ###-####
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | CANC |
Tell Riley
|
|
|
Steve Phone #: ###-####//need fire final prior to final occupancy inspection//
|
FIRE-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguisher, install door hardware, repair exit sign, remove thumbturn dead bolt, provide entire submittal package. Steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/30/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/20/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2019 | | DONE |
|
|
|
Called applicant and left a message that their permit is ready.
|
Routing - PLAN CHECK | 9/18/2019 | | 9/19/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 9/18/2019 | | 9/19/2019 | | DONE |
Michael Hanson
|
|
|
09/20 #528 L2 Paper - LASH CLIQUE Occ Eval
|
1st review completed | | | 9/19/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 9/19/2019 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (JG) | 9/17/2019 | 9/17/2019 | 9/18/2019 | | DEFR |
Javier Guzman
|
|
|
09/20 L2 (LASH CLIQUE DBA E.E. LASH DISTRIBUTION LLC) Occ Eval paper
|
Routing - PUBLIC WORKS | 9/17/2019 | | 9/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 9/17/2019 | | 9/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/17/2019 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/17/2019 | | DONE |
|
|
|
|
Application received | | | 9/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 15 2019 2:06PM
|