BLD-Final | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | PEND |
Mike Jordan
|
|
|
Sean *screened* Phone #: ###-####. Needs electrical, public works and zoning finals first. Ok to final after listed final inspections have been completed.
|
BLD-Energy code compliance | 3/12/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Mike Jordan
|
|
|
Sean Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2020 | 3/11/2020 | 3/11/2020 | P | FAIL |
Mike Jordan
|
|
|
Justin Phone #: ###-####. Foam top plate penetrations above electrical service. Nail off TJI web stiffeners per the plan. Pressure block 2x4 top chord handstack at front of garage. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | NR |
Dave Hannah
|
|
|
Sean Phone #: ###-####
|
BLD-Wall Bracing | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 12/5/2019 | 12/5/2019 | 12/6/2019 | P | PART |
Tony Young
|
|
|
concrete at 2 // Brandon Phone #: ###-####
|
BLD-Footing | 12/5/2019 | 12/5/2019 | 12/6/2019 | P | PASS |
Tony Young
|
|
|
Brandon Phone #: ###-####
|
BLD-Footing | 12/4/2019 | 12/4/2019 | 12/5/2019 | P | PASS |
Tony Young
|
|
|
Brandon Phone #: ###-####
|
PubWorks Subgrade Approval | 12/5/2019 | 12/5/2019 | 12/5/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PEND |
Tony Young
|
|
|
Brandon Phone #: ###-####// needs hillside approval
|
BLD-Footing | 12/3/2019 | 12/3/2019 | 12/4/2019 | P | PEND |
Tony Young
|
|
|
Brandon Phone #: ###-####,, ok pending soils approval
|
OVERRIDE | | | 11/7/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 9/24/2019 | 9/24/2019 | 11/7/2019 | | DONE |
Rob Patrick
|
|
|
10/11 sfd L2 ePlan
|
Routing - PLAN CHECK | 9/24/2019 | | 11/7/2019 | | PASS |
Rob Patrick
|
|
|
|
Issue PAID IN FULL permit | | | 11/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2019 | | DONE |
|
|
|
|
1st review completed | | | 11/7/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/7/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 9/25/2019 | | 10/4/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 9/24/2019 | | 9/26/2019 | | PASS |
Troy James
|
|
|
Builder is gong to install ductless system with bath fan for mechanical ventilation.
|
Routing - PLANNING | 9/24/2019 | | 9/26/2019 | | PASS |
Karla Nelson
|
|
|
Complies with CFH19-00071 and CAA19-00060
|
Route to Impact Fee Review | 9/24/2019 | 9/27/2019 | 9/25/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 9/24/2019 | 9/24/2019 | 9/25/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinkelrs not required.
|
Routing - Addressing | 9/24/2019 | | 9/25/2019 | | PASS |
Doug Chausow
|
|
|
ADU Address: 4068 W Hill Rd
|
Routing - PUBLIC WORKS | 9/24/2019 | | 9/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/24/2019 | | 9/25/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed
|
Plans ACCEPTED BY PLAN TECH | | | 9/24/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/24/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2019 | | DONE |
|
|
|
|
Application received | | | 9/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2019 2:35PM
|