Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-03682
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1701 S DRACO PL
Project NameFlorzic Addition
Customer NumberROUTE TO HILLSIDE AND ESC
ePlanReviewNo
Description
WUI - HILLSIDE - Permit for a 204sq' addition that adds a Bedroom and Full Bath. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20202/11/20202/11/2020PPASS
DetailsBrandon Shaw
Call me 30 to 45 minutes prior please so I can make sure we have access to the home thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled2/11/20202/11/20202/11/2020PPASS
DetailsBrandon Shaw
BLD-Energy code compliance12/16/201912/16/201912/16/2019APASS
DetailsBrandon Shaw
Ring doorbell and the grandmother will let you in. Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in12/11/201912/11/201912/11/2019PPASS
DetailsBrandon Shaw
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing12/11/201912/11/201912/11/2019PPASS
DetailsBrandon Shaw
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Foundation11/5/201911/6/201911/6/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing11/4/201911/5/201911/5/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing11/4/201911/4/201911/4/2019PFAIL
DetailsBrandon Shaw
Not ready, no plans/permit on site...
PubWorks Subgrade Approval10/25/201910/25/201910/25/2019 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
Plan assigned to (JAB) Josh10/3/201910/3/201910/9/2019 PASS
DetailsJosh Bogle
10/09 addition, paper
Routing - PLAN CHECK10/3/2019 10/9/2019 PASS
DetailsJosh Bogle
1st review completed  10/9/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  10/9/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/9/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/9/2019 DONE
DetailsJosh Bogle
ESC no - Energy yes
Routing - Erosion and Sediment10/9/2019 10/9/2019 PASS
DetailsAndy J. Long
Per Andy L over phone No ESC permit required.
Permit Ready to Issue  10/9/2019 DONE
Issue PAID IN FULL permit  10/9/2019 DONE
Routing PW Grading-Hillside10/3/2019 10/7/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Routing Walk-In (BLD)10/3/201910/3/201910/3/2019PPASS
DetailsJosh Bogle
took in as a level two and routed
Routing Walk-In (BLD)9/26/20199/26/20199/26/2019PFAIL
DetailsJosh Bogle
needs engineering, WUI details, attic venting
Routing Walk-In (Zoning)9/18/20199/18/20199/18/2019PPASS
DetailsJeff Lowe
Routing Walk-In (BLD)9/18/20199/18/20199/18/2019PFAIL
DetailsJenny Nelson
Need engineering for footings. Also section view
1st review completed  9/18/2019 DONE
DetailsJenny Nelson
Application received 9/18/2019