BLD-Final | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Brandon Shaw
|
|
|
Call me 30 to 45 minutes prior please so I can make sure we have access to the home thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 12/16/2019 | 12/16/2019 | 12/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Ring doorbell and the grandmother will let you in. Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | FAIL |
Brandon Shaw
|
|
|
Not ready, no plans/permit on site...
|
PubWorks Subgrade Approval | 10/25/2019 | 10/25/2019 | 10/25/2019 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
Plan assigned to (JAB) Josh | 10/3/2019 | 10/3/2019 | 10/9/2019 | | PASS |
Josh Bogle
|
|
|
10/09 addition, paper
|
Routing - PLAN CHECK | 10/3/2019 | | 10/9/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/9/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Routing - Erosion and Sediment | 10/9/2019 | | 10/9/2019 | | PASS |
Andy J. Long
|
|
|
Per Andy L over phone No ESC permit required.
|
Permit Ready to Issue | | | 10/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/9/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 10/3/2019 | | 10/7/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (BLD) | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Routing Walk-In (BLD) | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | FAIL |
Josh Bogle
|
|
|
needs engineering, WUI details, attic venting
|
Routing Walk-In (Zoning) | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | FAIL |
Jenny Nelson
|
|
|
Need engineering for footings. Also section view
|
1st review completed | | | 9/18/2019 | | DONE |
Jenny Nelson
|
|
|
|
Application received | | 9/18/2019 | | | |
|
|
|
|