Permit Information
Permit NumberBLD19-03692
StatusFinaled
Name SUN POWER SOLAR & ELECTRIC LLC
Site Address 18 S ORCHARD ST
Project NameSun Power Building Exterior TI
Customer NumberBLD19-03157 INTERIOR TI
ePlanReviewYes
Description
(SUN POWER BUILDING) ***SPECIAL INSPECTIONS REQUIRED, WITHDRAWAL OR PULL TEST REQUIRED ON EPOXIED BOLTS AS THE WORK HAS ALREADY BEEN PERFORMED SEE STRUCTURAL ENGINEERING*** Permit for the exterior facade improvements only. See BLD19-03157 for interior tenant improvements. Work to include: Demo exterior windows and doors per plans, construct new exterior facade including new double door storefront, new windows, new exterior finishes, extending exterior wall at entrance 2'-0" with wood construction. Approval is contingent on adhering to approved plans, engineering, local ordinances and policies. This building is not fire sprinkled. Structural engineering has been provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice11/14/201911/14/201911/26/2019 DONE
DetailsTell Riley
mailed 12-2-19
Letter of compliance/Occupancy  11/15/2019 DONE
BLD-Final11/14/201911/14/201911/14/2019PPASS
DetailsTell Riley
Mike- if possible please give 30 min ahead call Phone #: ###-####//special inspection report provided//exterior complete//door was fixed for proper operation//
DOC - Permit Finaled11/14/201911/14/201911/14/2019PPASS
DetailsTell Riley
BLD-Final10/31/201911/1/201911/1/2019PNR
DetailsTell Riley
Call ahead 30 minutes // Michael Phone #: ###-####//need to perfom pull test as per notes on plans//exterior finishes complete//
Issue PAID IN FULL permit  10/31/2019 DONE
Plan assigned to (M_H)10/22/2019 10/29/2019 DONE
DetailsMichael Hanson
1st review completed - 10/24 #518 L1 ePlan - Sun Power Bldg Exterior
Routing - PLAN CHECK10/29/2019 10/29/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/29/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/29/2019 DONE
all met in person
NEED
GC
Revised Certificate of Value
Route to Impact Fee Review10/22/201910/25/201910/23/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)10/22/201910/22/201910/22/2019 DEFR
DetailsJavier Guzman
10/24 L1 Sun Power Building Exterior ePlan
Routing - Design Review10/22/2019 10/22/2019 PASS
DetailsKatelyn Menuge
DRH19-00319
Routing - PLAN CHECK10/22/2019 10/22/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
1st review completed  10/22/2019 DONE
DetailsMichael Hanson
Intake Approval  10/18/2019 PASS
DetailsJavier Guzman
Intake Approval  10/15/2019 FAIL
DetailsBrian McGowan
Form #310, Special Inspections did not have the type of inspection required checked or specified. Please specify the inspection required. There is a page 10 of this form. Only 9 pages have been uploaded. Perhaps the Engineer's note on why special inspections are not required on on page 10.
Intake Approval  10/10/2019 FAIL
DetailsBrian McGowan
Form #310, Special Inspections did not have the type of inspection required checked or specified. Please specify the inspection required.
Intake Approval  9/27/2019 FAIL
DetailsBrian McGowan
Special Inspections are required as per ESR-3187.
Please provide calculations for the proposed new header at the 8' wide opening.
Intake Approval  9/25/2019 FAIL
DetailsBrian McGowan
Structural calculations are required. Please provide a completed form #310 for special Inspections.
Application received  9/18/2019 DONE
Application submitted via PDS Online on Sep 18 2019 3:57PM