First Notice | 11/14/2019 | 11/14/2019 | 11/26/2019 | | DONE |
Tell Riley
|
|
|
mailed 12-2-19
|
Letter of compliance/Occupancy | | | 11/15/2019 | | DONE |
|
|
|
|
BLD-Final | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Tell Riley
|
|
|
Mike- if possible please give 30 min ahead call Phone #: ###-####//special inspection report provided//exterior complete//door was fixed for proper operation//
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/31/2019 | 11/1/2019 | 11/1/2019 | P | NR |
Tell Riley
|
|
|
Call ahead 30 minutes // Michael Phone #: ###-####//need to perfom pull test as per notes on plans//exterior finishes complete//
|
Issue PAID IN FULL permit | | | 10/31/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 10/22/2019 | | 10/29/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 10/24 #518 L1 ePlan - Sun Power Bldg Exterior
|
Routing - PLAN CHECK | 10/29/2019 | | 10/29/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/29/2019 | | DONE |
|
|
|
all met in person
NEED
GC
Revised Certificate of Value
|
Route to Impact Fee Review | 10/22/2019 | 10/25/2019 | 10/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JG) | 10/22/2019 | 10/22/2019 | 10/22/2019 | | DEFR |
Javier Guzman
|
|
|
10/24 L1 Sun Power Building Exterior ePlan
|
Routing - Design Review | 10/22/2019 | | 10/22/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00319
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
1st review completed | | | 10/22/2019 | | DONE |
Michael Hanson
|
|
|
|
Intake Approval | | | 10/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/15/2019 | | FAIL |
Brian McGowan
|
|
|
Form #310, Special Inspections did not have the type of inspection required checked or specified. Please specify the inspection required. There is a page 10 of this form. Only 9 pages have been uploaded. Perhaps the Engineer's note on why special inspections are not required on on page 10.
|
Intake Approval | | | 10/10/2019 | | FAIL |
Brian McGowan
|
|
|
Form #310, Special Inspections did not have the type of inspection required checked or specified. Please specify the inspection required.
|
Intake Approval | | | 9/27/2019 | | FAIL |
Brian McGowan
|
|
|
Special Inspections are required as per ESR-3187.
Please provide calculations for the proposed new header at the 8' wide opening.
|
Intake Approval | | | 9/25/2019 | | FAIL |
Brian McGowan
|
|
|
Structural calculations are required. Please provide a completed form #310 for special Inspections.
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2019 3:57PM
|