BLD-Final | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | NR |
Jim Storey
|
|
|
Josh *screened* Phone #: ###-#### plm and fire need signed off// nuts need tightened.
|
Plan Reviewer's activity | | | 7/17/2020 | | DONE |
Michael Hanson
|
|
|
Removed plumbing inspection sign off requirement per Dan Ediger and Carl Madsen. DEQ is to inspect.
|
Inspection Record Card- Bld | | | 6/30/2020 | | DONE |
|
|
|
|
BLD-Final | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | DEFR |
Jim Storey
|
|
|
Nicol....... screened Phone #: ###-#### planreview and plm sup. revising permit and communicating with permitees
|
Plan Reviewer's activity | | | 6/25/2020 | | DONE |
Michael Hanson
|
|
|
Added plumbing inspection sign off requirements.
|
Print Occupancy Form | | | 6/25/2020 | | DONE |
|
|
|
|
BLD-Foundation | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Jim Storey
|
|
|
rebar // Nicol Phone #: ###-####
|
Permit Ready to Issue | | | 11/6/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2019 | | DONE |
|
|
|
|
Routing - FIRE | 11/5/2019 | 11/5/2019 | 11/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Meeting | | | 11/5/2019 | | DONE |
|
|
|
waiting to hear back from tisha, unable to batch stamp an item
|
Plan assigned to (M_H) | 10/11/2019 | | 11/5/2019 | | DONE |
Michael Hanson
|
|
|
3rd review completed - 10/16 #518 L1 ePlan - Wells Fargo - Fuel Tank
|
Routing - PLAN CHECK | 11/5/2019 | | 11/5/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - FIRE | 11/4/2019 | 11/4/2019 | 11/4/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Routing - PLAN CHECK | 11/4/2019 | | 11/4/2019 | | FAIL |
Michael Hanson
|
|
|
Plans need updated to reflect new fuel tank location. Engineering is updating frost depth and anchor bolt information.
|
Route to Impact Fee Review | 10/16/2019 | 10/19/2019 | 10/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/16/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 10/11/2019 | | 10/16/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - FIRE | 10/11/2019 | 10/11/2019 | 10/15/2019 | | FAIL |
Erika Akin
|
|
|
10/16 L1 Wells Fargo - Fuel Tank ePlan
|
Routing PW Drainage | 10/11/2019 | | 10/15/2019 | | PASS |
Brian Murphy
|
|
|
O and M of utility treaching small above ground tank
|
Routing - MECHANICAL | 10/11/2019 | | 10/15/2019 | | PASS |
Troy James
|
|
|
No mechanical work.
|
Routing - PUBLIC WORKS | 10/11/2019 | | 10/11/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 10/11/2019 | | 10/11/2019 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 10/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/27/2019 | | FAIL |
Brian McGowan
|
|
|
1. No engineering calculations were provided. Please upload them. (Provide form #310 if Special Inspections are required.)
2. Please indicate how the tank is attached to the slab.
|
Intake Approval | | | 9/25/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following for your Prescreen to be approved:
1. Planning and Zoning Letters of Approval.
2. Sheet C1.0 does not provide the required area for the City Approval Stamp in the lower right corner.
3. Please list the City of Boise Current Codes on the Cover Sheet.
4. No engineering calculations were provided. Please upload them. (Provide form #310 if Special Inspections are required.)
|
Intake Approval | | | 9/19/2019 | | FAIL |
Brian McGowan
|
|
|
No Submittal Checklist was uploaded and no Drawings were uploaded.
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2019 4:48PM
|