BLD-Final | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Jim Page
|
|
|
Previously noted have been corrected, no fire sprinkler modifications, no fire alarm modificaitons, fire exitnguisher is placed with current inspection tag. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
john Phone #: ###-####
|
Permanent Occupancy | | | 1/10/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | FAIL |
Jim Page
|
|
|
Provide annual inspection for fire extinguisher. Install ceiling tiles that are missing, ceiling tiles must be in place or upright fire sprinkler protection will be required, a seperate permit will be required if fire sprinkler system needs modified. Provide signage at main entry reading "Door to remain unlocked while building is occupied".
John Phone #: ###-####
|
Plan assigned to (CJW) | 11/22/2019 | 11/22/2019 | 11/27/2019 | | PASS |
Carl Westfall
|
|
|
plan mod - Forever Nails - Routed to staff.
|
Plan Reviewer's activity | | | 11/27/2019 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 11/27/2019 | | DONE |
|
|
|
PLAN MOD
|
Print Occupancy Form | | | 11/27/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/27/2019 | | DONE |
|
|
|
|
Routing - PLUMBING | 11/25/2019 | | 11/26/2019 | | PASS |
Dan Ediger
|
|
|
Install 3 in. end of line clean out.
|
Routing PW Sewer Rating | 11/25/2019 | | 11/25/2019 | | PASS |
Morgan Webb
|
|
|
SAME FIXTURE COUNT.
|
Routing - PLAN CHECK | 11/25/2019 | | 11/25/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
Routing - PLAN CHECK | 11/22/2019 | | 11/25/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake review
|
Plan Modification Accepted | | | 11/22/2019 | | DONE |
|
|
|
plan mod to submit plumbing change
|
Issue PAID IN FULL permit | | | 11/1/2019 | | DONE |
|
|
|
Emailed permits to be signed to- onedoneremodeling@gmail.com
Eplan needs to be released
|
Print Occupancy Form | | | 11/1/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/26/2019 | 10/21/2019 | 10/29/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 10/14/19 (L-3 - 15 days) (eplan - 6 sheets) Forever Nails (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2019 | | DONE |
|
|
|
Please call the tenant owner Duc Nyguen at ###-#### when the permit is ready to issue.
|
Permit Ready to Issue | | | 10/29/2019 | | DONE |
|
|
|
ALL MET (onedoneremodeling@gmail.com)
NEED
GC
Revised Certificate of Value
|
Telephone call | | | 10/29/2019 | | DONE |
|
|
|
called Duc Nyguen and informed him that we need a 302 and 306 form
and the if he is going to be his own GC he will need a letter from the parcel owner giving him authority to do the work, he was also inform that the GC for the trades need will need to be license
|
Routing - PLAN CHECK | 10/25/2019 | | 10/28/2019 | | PASS |
Carl Westfall
|
|
|
Routed drawings
|
Routing - MECHANICAL | 10/28/2019 | | 10/28/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 10/24/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/22/2019 | 10/25/2019 | 10/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/22/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/22/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 10/22/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - FIRE | 9/26/2019 | 9/26/2019 | 10/21/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 9/26/2019 | | 10/2/2019 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing - PLANNING | 9/26/2019 | | 9/30/2019 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 9/26/2019 | | 9/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2019 | | 9/30/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 9/26/2019 | | 9/27/2019 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Intake Approval | | | 9/24/2019 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/20/2019 | | PASS |
|
|
|
Plan intake review approved
|
Application received | | | 9/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2019 9:36AM
|