BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tell Riley
|
|
|
Mark - */Screened*/ Phone #: ###-####//corrections have been completed//
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | FAIL |
Tell Riley
|
|
|
screened // Mark Phone #: ###-####//handrail at top flight of stairs on exterior stariway needs to return to post//
|
BLD-Final | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | FAIL |
Tell Riley
|
|
|
Call for access ... ok with video/photo // Mark Phone #: ###-####//handrail on exterior stairs does not mee code requirements// see correction notice for code sections of handrails//other corrections have been made//
|
BLD-Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | DONE |
Tell Riley
|
|
|
Zack-###-####- first thing
|
BLD-Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 | A | DONE |
Tell Riley
|
|
|
Zack-###-####- first thing
|
BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | FAIL |
Tell Riley
|
|
|
Mark *no one on site, call for access* Screened* Phone #: ###-####//correction notice posted for three corrections that were not completed for code compliance//
|
BLD-Blower Door Test Results | 8/4/2020 | 8/4/2020 | 8/4/2020 | A | DONE |
Tell Riley
|
|
|
3.8 ACH 50
|
BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | FAIL |
Mike Jordan
|
|
|
call for garage code - screened // Mark Phone #: ###-####. Provide blower door test result and post. Firecaulk all penetrations in garage. Steps in garage exceed the max 3/8 inch measurement between steps. Guardrail upstairs does not meet the 36 inch min. height requirment. Provide code compliant handrail on exterior stairs, guards at mid landing closest to garage exceed the 4 incnh max spacing. Correction notice posted.
|
BLD-Conference | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | DONE |
Tell Riley
|
|
|
adam Phone #: ###-####//discussed via phone, front door will be required to be main egress, one step allowed to landing, landing must be 36" in direction of travel and as wide as door//also sent photo of code sections for required egress and landing//
|
BLD-Energy code compliance | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Tell Riley
|
|
|
Mark Phone #: ###-####//header added//insulation ok in walls//one attic area is R38 and needs to be R49--let contractor know prior to cover R49 needs to be installed//garage walls and ceiling insulated//second story of garage not insulated//will check deck and stairs at final-no handrails installed//
|
BLD-Framing/Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Tell Riley
|
|
|
Mark- please call for access Phone #: ###-####//still needs header at stairs over mechanical on exterior wall//ok to insulate house and garage//steps, deck etc has several code issues, went over onsite//
|
CHANGE STATUS TO (ISS) | | | 2/14/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/4/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 1/31/2020 | 1/31/2020 | 2/4/2020 | | DONE |
Jenny Nelson
|
|
|
02/07 Plan mod
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
(plans are in the drawer) left a message informing plan mod is ready and the fee amount due
|
Routing - PLAN CHECK | 2/4/2020 | | 2/4/2020 | | PASS |
Jenny Nelson
|
|
|
Plan mod ok
|
Case Summary (BLD) | | | 2/4/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 2/4/2020 | | DONE |
|
|
|
PLAN MOD PAPER WORK IN THE DRAWER
|
BLD-Framing/Rough-in | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//see red marks for corrections//need mech permit for FP//no access to garage 2n floor//ok to insulate house only//
|
Plan Reviewer's activity | | | 1/31/2020 | | DONE |
Michael Hanson
|
|
|
Additional garage entry for 450 sqft attached was missed during first review.
|
(F) Reprint permit | | | 1/31/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/31/2020 | | DONE |
|
|
|
change stairs and add porch on detached garage
|
BLD-Conference | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | FAIL |
Brandon Shaw
|
|
|
Stop Work Order posted for detached garage... BLD19-03701 is for new familiy dwelling with attached garage only. Seperate permit is needed for detached garage with ADU... PDS approval needed for ADU...
|
BLD-Wall Bracing | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//exterior ok//will need to make corrections to interior shear locations--check at framing//
|
CHANGE STATUS TO (ISS) | | | 12/30/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/23/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 12/20/2019 | 12/20/2019 | 12/23/2019 | | DONE |
Jenny Nelson
|
|
|
plan mod
|
Routing - PLAN CHECK | 12/23/2019 | | 12/23/2019 | | PASS |
Jenny Nelson
|
|
|
Plan mod passed
|
Case Summary (BLD) | | | 12/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/23/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan Modification Accepted | | | 12/20/2019 | | DONE |
|
|
|
Changing to strapes, going from nail pattern to staples.
|
BLD-Wall Bracing | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | FAIL |
Tell Riley
|
|
|
Mark Phone #: ###-####//need to add hardware to portal frames//need conversion for staples from engineer//add blockin as discussed//add hot dipped galvanized nails at sill plates//
|
BLD-Conference | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | DONE |
Tell Riley
|
|
|
call Mark ###-####//discrepancies in engineering and architectural plans for shear and hold down locations//plan mod required for changes to correct//1 ft encroachment on side setback will need to be approved by zoning//
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | DONE |
Tell Riley
|
|
|
mark Phone #: ###-####
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | CANC |
Tell Riley
|
|
|
call Mark ###-####
|
BLD-Framing/Rough-in | 11/27/2019 | 11/29/2019 | 11/29/2019 | P | CANC |
Tell Riley
|
|
|
Mark cancel and will call back to reschedule. floor // Mark Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tell Riley
|
|
|
Adam- pouring at 2pm Phone #: ###-####//WIP-will get bolts and hold downs installed//blankets onsite//
|
BLD-Footing | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PART |
Tell Riley
|
|
|
Adam - pouring schedule for 1:30 Phone #: ###-####//rebar per plans//setbacks per plans//WIP...
|
Telephone call | | | 10/8/2019 | | DONE |
|
|
|
called Mark to let know permit is ready
|
Issue PAID IN FULL permit | | | 10/8/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 10/7/2019 | | |
|
|
|
|
Routing - PLAN CHECK | 10/7/2019 | | 10/7/2019 | | PASS |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 10/7/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2019 | | DONE |
|
|
|
met
|
Plan assigned to (J_N) | 9/19/2019 | | 10/7/2019 | | DONE |
Jenny Nelson
|
|
|
10/02 sfd L1 ePlan. 1st complete, need engineering.
|
Plan resubmittals received | | | 10/3/2019 | | DONE |
|
|
|
Two copies of Geometry calculations taken to jenny
|
1st review completed | | | 10/2/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 10/2/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 9/23/2019 | | 9/26/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 9/23/2019 | | 9/23/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2019 | | 9/23/2019 | | PASS |
Morgan Webb
|
|
|
Customer must build the service line for the sewer.
|
Route to Impact Fee Review | 9/19/2019 | 9/22/2019 | 9/20/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/19/2019 | | 9/20/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/19/2019 | | PASS |
|
|
|
|
Application received | | 9/19/2019 | | | |
|
|
|
|