Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-03703
StatusIssued
Name BB ENTERPRISES INC
Site Address 1114 W FRONT ST Unit: STE 101
Project NamePatio Addition
Customer Number 
ePlanReviewYes
Description
(WOODLAND EMPIRE - OUTDOOR PATIO ADDITION) This is a scope of work permit only issuance of a certificate of completion upon final inspection and approval. Permit to construct a 360 sqft patio with wood frame and steel diamond plate floor for outdoor seating on the east side of an existing brewery. Work to include: Construct patio level with existing floor, steel 2"x2"x1/4" tube railing 30" high, 30" high 14" wide bar for patrons and seating for approximately 16 occupants. This building is not fire sprinkled. Approval is contingent to adhering to the approved plans, local codes, and ordinances. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20202/19/20202/19/2020PPASS
DetailsDave Hannah
Brandon Phone #: ###-####
Zoning Approval2/19/20202/19/20202/19/2020 PASS
DetailsKayCee Babb
Per DRH19-00284 and plans approved through Building permit. Any future exterior alterations or temporary uses shall require additional review.
FIRE-Final Inspection2/14/20202/14/20202/14/2020PPASS
DetailsTroy Cobbley
Life safety passed.

Brandon Phone #: ###-####
BLD-Final2/13/20202/14/20202/14/2020ANR
DetailsJim Storey
call with questions- Brandon Phone #: ###-#### need p&z and fire sign offs
BLD-Framing/Rough-in2/10/20202/11/20202/11/2020PPASS
DetailsDave Hannah
call 1 hr ahead // Brandon Phone #: ###-####
Plan Reviewer's activity  1/13/2020 DONE
DetailsMichael Hanson
Removed requirement for special inspections. New patio design does not have post installed epoxy or welding.
Inspection Record Card- Bld  1/10/2020 DONE
Issue PAID IN FULL permit  1/10/2020 DONE
Telephone call  1/7/2020 DONE
called Carrie asking her for the 302 and 306 from the GC. She said that she believes the owner is hiring a GC and has forwarded my email to them to get the forms signed by the right people.
Route to Impact Fee Review1/3/20201/6/20201/6/2020 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Permit Ready to Issue  1/6/2020 DONE
all met:
ACHD
GC Form
Revised Cert of Value
(double check impact fees activity is signed off)
PLANS/APPL TAKEN TO FRONT DESK  1/3/2020 DONE
DetailsMichael Hanson
Routing Off Site - STRUCTURAL1/3/2020 1/3/2020 PASS
DetailsMichael Hanson
Per ePlan approval
Plan assigned to (M_H)10/4/2019 1/3/2020 DONE
DetailsMichael Hanson
2nd review completed - 10/10 #518 L2 ePlan - Patio Addition
Routing - PLAN CHECK12/26/2019 12/26/2019 PASS
DetailsMichael Hanson
Routing PW Solid Waste12/19/2019 12/20/2019 PASS
DetailsEvan Carpenter
Routing PW Street Lights12/19/2019 12/20/2019 PASS
DetailsTom Marshall
Routing Off Site - STRUCTURAL12/18/2019 12/20/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
Routing PW Drainage12/19/2019 12/19/2019 PASS
DetailsBrian Murphy
Routing - Design Review12/18/2019 12/18/2019 PASS
DetailsKayCee Babb
To comply with all conditions of approval of DRH19-00284, as revised November 20, 2019. Conditions of approval include, but are not limited to: Existing patio enclosure on site, using corrugated metal and wood, shall be removed from the site or documentation of Design Review approval submitted to Staff; Site is not approved for outdoor storage of shipping containers. All shipping containers shall be removed from the site.
Routing - PLANNING12/18/2019 12/18/2019 PASS
DetailsDavid Moser
Plan Reviewer's activity  12/4/2019 DONE
DetailsMichael Hanson
Emailed applicant for status. They have completely redesigned and they are discussing with DR before resubmitting.
Routing Off Site - STRUCTURAL10/4/2019 10/18/2019 FAIL
DetailsMichael Hanson
Per ePlan corrections required by D. Haugland @ AHJ
1st review completed  10/18/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK10/10/2019 10/10/2019 FAIL
DetailsMichael Hanson
Routing PW Solid Waste10/4/2019 10/8/2019 PASS
DetailsEvan Carpenter
Routing PW Street Lights10/4/2019 10/7/2019 PASS
DetailsTom Marshall
Routing PW Drainage10/4/2019 10/4/2019 PASS
DetailsBrian Murphy
Routing - Design Review10/4/2019 10/4/2019 PASS
DetailsKayCee Babb
To comply with all conditions of approval of DRH19-00284, as revised Aug. 20, 2019. Conditions of approval include, but are not limited to: Existing patio enclosure on site, using corrugated metal and wood, shall be removed from the site or documentation of Design Review approval submitted to Staff; Site is not approved for outdoor storage of shipping containers. All shipping containers shall be removed from the site.
Routing - PUBLIC WORKS10/4/2019 10/4/2019 PASS
DetailsMorgan Webb
Plan Reviewer's activity  9/30/2019 DONE
DetailsMichael Hanson
***APPLICANT DID NOT PROVIDE COMPLETED #310 COVERSHEET (MISSING OWNERS SIGNATURE) I APPROVED THE PRESCREEN AS I DIDN'T WANT TO HOLD UP THE REVIEW FOR A SINGLE SIGNATURE. THE #310 SHALL BE UPDATED WITH ALL FIELDS COMPLETED PRIOR TO ISSUING PERMIT. MDH 09-30-2019
Intake Approval  9/26/2019 FAIL
DetailsMichael Hanson
09/26
#310 form must be completed in it's entirety and upload all 10 pages. There is epoxy being used and so a special inspection is required and must be indicated on pg. 2 and pg. 3 table 2 the #310 form.
---------------------
Please provide the 310 special inspection form for welding and post installed anchors.
Please provide documentation for shade material demonstrating compliance with Section 3105.
Update the steel beam and footing calculations to show IBC 2015 instead of IBC 2012.
Intake Approval  9/24/2019 FAIL
DetailsMichael Hanson
Application received  9/19/2019 DONE
Application submitted via PDS Online on Sep 19 2019 11:01AM