Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03717
StatusFinaled
Name RAINBOW CONSTRUCTIONS LLC
Site Address 2307 N LIBERTY ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2024 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 444 sq. ft. of covered patio/porch and a 665 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20202/28/20202/28/2020PPASS
DetailsTell Riley
DOC - Permit Finaled2/28/20202/28/20202/28/2020PPASS
DetailsTell Riley
BLD-Blower Door Test Results2/28/20202/28/20202/28/2020PDONE
DetailsTell Riley
3.72 ACH 50
BLD-Final2/27/20202/28/20202/28/2020ANR
DetailsTell Riley
Robert Phone #: ###-####///need blower door test//attic access located in garage and attic can be accessed througout the home//CN posted//
BLD-Wall Bracing1/10/20201/10/20201/10/2020PPASS
DetailsTell Riley
Robert Phone #: ###-####//Gyp board shear ok in the two areas noted on plans//
BLD-Energy code compliance1/3/20201/6/20201/6/2020APASS
DetailsTell Riley
Robert Phone #: ###-####
BLD-Framing/Rough-in1/6/20201/6/20201/6/2020APASS
DetailsTell Riley
Framing corrections made//Mechancal roughs ok//
BLD-Framing/Rough-in12/31/201912/31/201912/31/2019PPEND
DetailsTell Riley
robert Phone #: ###-####//pending mechanical approval on FP's//see truss packet and red marks//add plys to headers per plans//ok to insulate once mechanical is approved//
BLD-Wall Bracing12/6/201912/9/201912/9/2019PPASS
DetailsTell Riley
shear // Robert Phone #: ###-####
BLD-Foundation11/7/201911/8/201911/8/2019APASS
DetailsTell Riley
Nick- foundation wall inspection-Concrete at 11am (was infrom that time is not guaranteed) Phone #: ###-####
BLD-Footing11/2/201911/4/201911/4/2019APASS
DetailsBrandon Shaw
Footing inspection. Concrete scheduled for 10:30 AM Monday November 4

Please call me if you have any questions. Phone #: ###-#### Inspection requested via web by Nick Louie
OVERRIDE  10/30/2019  
Plan assigned to (RDP)9/20/20199/20/201910/30/2019 DONE
DetailsRob Patrick
10/03 sfd L1 PAPER...10/22 Failed
Routing - PLAN CHECK10/30/2019 10/30/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  10/30/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/30/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  10/30/2019 DONE
met
Inspection Record Card- Bld  10/30/2019 DONE
Issue PAID IN FULL permit  10/30/2019 DONE
Plan Reviewer's activity  10/25/2019  
DetailsBrian McGowan
Spoke with Robert about the engineering required at the rear covered porch. Tried to explain that it is the shear and lateral of the posts that are the concern, not the engineered trusses. The IRC has no method to evaluate the shear and lateral of posts, only walls.
Routing - PLAN CHECK10/22/2019 10/22/2019 FAIL
DetailsRob Patrick
Corrections/Engineering req'd
Routing - PLANNING10/18/2019 10/18/2019 PASS
DetailsSue Cummings
revised site plan. Meets rear setback now. SC
Plan resubmittals received  10/18/2019 DONE
Two full set of plans and two small site plans stamped and taken to plan reviewer.
Routing - PLAN CHECK9/26/2019 10/15/2019 FAIL
DetailsRob Patrick
Failed for Planning comment. Bldg review was not done due to possible change in plan.
1st review completed  10/15/2019 FAIL
DetailsRob Patrick
Failed for Planning comment. Bldg review was not done due to possible change in plan.
Routing - MECHANICAL9/24/2019 9/26/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING9/23/2019 9/24/2019 FAIL
DetailsSue Cummings
Doesn't meet the required 15 ft. rear setback. (plan shows 10 ft.)
Route to Impact Fee Review9/20/20199/23/20199/23/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS9/20/2019 9/23/2019 PASS
DetailsMorgan Webb
Routing - Addressing9/20/2019 9/20/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  9/20/2019 DONE
Override - Parcel Holds  9/20/2019  
Recd Pcfee & Taken To Pln CK  9/20/2019 DONE
Intake Approval  9/20/2019 PASS
Application received 9/20/2019