BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Tell Riley
|
|
|
|
DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | DONE |
Tell Riley
|
|
|
3.72 ACH 50
|
BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | NR |
Tell Riley
|
|
|
Robert Phone #: ###-####///need blower door test//attic access located in garage and attic can be accessed througout the home//CN posted//
|
BLD-Wall Bracing | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Tell Riley
|
|
|
Robert Phone #: ###-####//Gyp board shear ok in the two areas noted on plans//
|
BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Tell Riley
|
|
|
Robert Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Tell Riley
|
|
|
Framing corrections made//Mechancal roughs ok//
|
BLD-Framing/Rough-in | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PEND |
Tell Riley
|
|
|
robert Phone #: ###-####//pending mechanical approval on FP's//see truss packet and red marks//add plys to headers per plans//ok to insulate once mechanical is approved//
|
BLD-Wall Bracing | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
shear // Robert Phone #: ###-####
|
BLD-Foundation | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Tell Riley
|
|
|
Nick- foundation wall inspection-Concrete at 11am (was infrom that time is not guaranteed) Phone #: ###-####
|
BLD-Footing | 11/2/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection. Concrete scheduled for 10:30 AM Monday November 4
Please call me if you have any questions. Phone #: ###-#### Inspection requested via web by Nick Louie
|
OVERRIDE | | | 10/30/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 9/20/2019 | 9/20/2019 | 10/30/2019 | | DONE |
Rob Patrick
|
|
|
10/03 sfd L1 PAPER...10/22 Failed
|
Routing - PLAN CHECK | 10/30/2019 | | 10/30/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 10/30/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/30/2019 | | DONE |
|
|
|
met
|
Inspection Record Card- Bld | | | 10/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/30/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 10/25/2019 | | |
Brian McGowan
|
|
|
Spoke with Robert about the engineering required at the rear covered porch. Tried to explain that it is the shear and lateral of the posts that are the concern, not the engineered trusses. The IRC has no method to evaluate the shear and lateral of posts, only walls.
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections/Engineering req'd
|
Routing - PLANNING | 10/18/2019 | | 10/18/2019 | | PASS |
Sue Cummings
|
|
|
revised site plan. Meets rear setback now. SC
|
Plan resubmittals received | | | 10/18/2019 | | DONE |
|
|
|
Two full set of plans and two small site plans stamped and taken to plan reviewer.
|
Routing - PLAN CHECK | 9/26/2019 | | 10/15/2019 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning comment. Bldg review was not done due to possible change in plan.
|
1st review completed | | | 10/15/2019 | | FAIL |
Rob Patrick
|
|
|
Failed for Planning comment. Bldg review was not done due to possible change in plan.
|
Routing - MECHANICAL | 9/24/2019 | | 9/26/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 9/23/2019 | | 9/24/2019 | | FAIL |
Sue Cummings
|
|
|
Doesn't meet the required 15 ft. rear setback. (plan shows 10 ft.)
|
Route to Impact Fee Review | 9/20/2019 | 9/23/2019 | 9/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 9/20/2019 | | 9/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 9/20/2019 | | 9/20/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/20/2019 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/20/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/20/2019 | | PASS |
|
|
|
|
Application received | | 9/20/2019 | | | |
|
|
|
|