BLD-Aging Inspection | 8/5/2020 | 8/5/2020 | 8/7/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/4/2020 | 8/4/2020 | 8/5/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 10/14/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Tony Young
|
|
|
Sometime between 9 - 11 am would be great. thank you. Phone #: ###-#### Inspection requested via web by Marisa Weppner,, frame ok to cover,,
|
BLD-Conference | 10/10/2019 | 10/17/2019 | 10/14/2019 | A | CANC |
Tony Young
|
|
|
Around 9 am is a good time if possible. Thank you. Phone #: ###-#### >> Inspection requested via web by Marisa Weppner Inspection cancelled from web by: Marisa Weppner
|
Routing Walk-In (BLD) | 9/20/2019 | 9/20/2019 | 9/20/2019 | A | FAIL |
Michael Hanson
|
|
|
Sent to planning to confirm previous DRH approval.
|
Routing Walk-In (Zoning) | 9/20/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
KayCee Babb
|
|
|
Per DRH19-00397. No shower or full bath proposed or approved with this application. Future installation will require separate historic and current planning applications. Site to be provided with pavedp arking a minimum of 18'x20', with 20' of backup space, as shown on submitted plans.
|
Routing Walk-In (BLD) | 9/20/2019 | 9/20/2019 | 9/20/2019 | A | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 9/20/2019 | 9/20/2019 | 9/20/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/20/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/20/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/20/2019 | | 9/20/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 9/20/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 9/20/2019 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 9/20/2019 | | | |
|
|
|
|