BLD-Final | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Brandon Shaw
|
|
|
Screened- yes, wife is a nurse at hospital in the Cov-19 unit- video inspection- Conner Phone #: ###-####
|
DOC - Permit Finaled | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | DONE |
Brandon Shaw
|
|
|
Conner Phone #: ###-####
|
BLD-Framing/Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Brandon Shaw
|
|
|
Phase I-Framing and insulation, ok to cover... Phase II- Footing and foundations, at a later date...
|
Routing Walk-In (BLD) | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Josh Bogle
|
|
|
chatted about a potential Modification
|
CHANGE STATUS TO (ISS) | | | 1/6/2020 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | FAIL |
Josh Bogle
|
|
|
needs engineering for lateral and a foundation
|
Routing Walk-In (Zoning) | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | FAIL |
Michael Hanson
|
|
|
Applicant needs more plans and structural engineering. The desire is to enclose the existing patio but not condition the space so not requiring meeting 2015 IECC just structural.
|
Telephone call | | | 9/20/2019 | | |
|
|
|
**Parcel owner needs to send a written statement to Allow Corner Murphy to pull permit**
|
1st review completed | | | 9/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 9/20/2019 | | | |
|
|
|
|