DOC - Permit Finaled | | | 1/28/2020 | | DONE |
|
|
|
final inspection was completed on 1/14/20
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew
|
FIRE-Final Inspection | 12/23/2019 | 12/26/2019 | 12/26/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications,l fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, permit sign off card not available at time of inspection, no signatures provided.
life/ safety and final Phone #: ###-#### Inspection requested via web by rick pew
|
BLD-Ceiling Grid Inspection | 12/11/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Tony Young
|
|
|
Rick Phone #: ###-####,, ok after minor fixes
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew
|
BLD-Conference | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | PART |
Tony Young
|
|
|
contact Rick want approval for one side cover on walls Phone #: ###-#### Inspection requested via web by rick pew,, one side cover of walls ok
|
Inspection Record Card- Bld | | | 10/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 10/9/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 10/8/2019 | | 10/9/2019 | | DONE |
Michael Hanson
|
|
|
10/04 - L2 TAI
|
1st review completed | | | 10/9/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/9/2019 | | DONE |
|
|
|
ALL MET
Need
GC Form
Revised Cert of Value
|
Plan assigned to (JAR) | 9/26/2019 | 9/26/2019 | 10/8/2019 | | DEFR |
Julie Romig
|
|
|
10/04 - L2 TAI
|
Routing - FIRE | 9/26/2019 | 9/26/2019 | 10/2/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler and/or alarm system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
Intake Approval | | | 9/23/2019 | | PASS |
|
|
|
|
Intake Approval | | | 9/21/2019 | | FAIL |
Julie Romig
|
|
|
Need: 1. Hardware schedule only states "Match Existing". Please provide hardware schedule with locking function and handle style to verify compliance with egress and accessibility requirements.
2. Two permits have been created for this tenant suite with similar descriptions, BLD19-03732 and BLD19-03733. Would you like the second permit, BLD19-03733, voided (no drawings uploaded into this permit)?
|
Application received | | | 9/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 20 2019 7:13PM
|