Plan Modification Accepted | | | 8/12/2020 | | DONE |
|
|
|
Updating Mechanical Sheets
|
BLD-Framing/Rough-in | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | CANC |
Mike Jordan
|
|
|
progress shear inspection due to hidden OSB when wall is stood. Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Wall Bracing | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Mike Jordan
|
|
|
progress shear inspection due to hidden OSB when wall is stood. Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Concrete | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Mike Jordan
|
|
|
Non-Structural building interior slab on grade ready for placement Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Energy code compliance | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Mike Jordan
|
|
|
Metal Building Simple Saver Insulation System Complete Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | PASS |
Mike Jordan
|
|
|
Pre-engineered building erected, ready for insulation covering of purlins and girts. Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Energy code compliance | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Jim Storey
|
|
|
Rigid Insulation Inspection on stem walls, ready for backfill. Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD-Foundation | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Mike Jordan
|
|
|
north stem wall rebar inspection (other half) Phone #: ###-#### Inspection requested via web by Dan Murrer. north perimeter stemwalls.
|
BLD-Foundation | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Mike Jordan
|
|
|
rebar inspection for 1/2 of the stem walls. Phone #: ###-#### Inspection requested via web by Dan Murrer. South and west exterior stemwalls.
|
BLD-Foundation | 6/16/2020 | 6/17/2020 | 6/17/2020 | P | CANC |
Mike Jordan
|
|
|
Building Stem Wall Concrete. If possible, request inspection as soon as possible after lunch hour. Concrete scheduled for mid-afternoon. MTI scheduled for special inspections. Phone #: ###-#### >> Inspection requested via web by Dan Murrer Inspection cancelled from web by: Dan Murrer
|
BLD-Footing | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PART |
Mike Jordan
|
|
|
Rebar Inspection for Afternoon pour Phone #: ###-#### Inspection requested via web by Dan Murrer. Perimeter footings and column psd footings. Work in progress. Ok to place concrete pending special inspection.
|
BLD-Footing | 6/12/2020 | 6/15/2020 | 6/15/2020 | P | CANC |
Mike Jordan
|
|
|
If possible request inspection at 3PM. MTI will be there at 3PM as well for rebar, and concrete cylinders for pour at 4PM Phone #: ###-#### >> Inspection requested via web by Dan Murrer Inspection cancelled from web by: Dan Murrer
|
BLD-Other | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | CANC |
Mike Jordan
|
|
|
Erosion and Sediment Control Program Site Preparation Inspection Phone #: ###-#### Inspection requested via web by Dan Murrer
|
Issue PAID IN FULL permit | | | 5/15/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 5/15/2020 | | DONE |
|
|
|
RP is still required.
|
CHANGE STATUS TO (ISS) | | | 5/15/2020 | | DONE |
|
|
|
RP met
|
Meeting | | | 5/11/2020 | | DONE |
|
|
|
Okay to issue WITHOUT BLD19-04010. Permit for Facility 20(BLD9-04010) to be issued later this year and has been split into it's own ePlan permit. All site work will be completed under BLD20-03734
|
Telephone call | | | 5/5/2020 | | DONE |
|
|
|
sent email to DLT, applicant and other about permit being expired
|
OVERRIDE | | | 3/30/2020 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/30/2020 | | DONE |
|
|
|
NEED- RP-met 5/15/20
ACHD - met 5-11-20 cpw
METGC
METRev Values
|
Plan assigned to (M_H) | 10/16/2019 | | 3/30/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 11/26 #502 L3 ePlan - JD/Fischer Bldg 10
|
Routing PW Street Lights | 3/27/2020 | | 3/27/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 3/27/2020 | | 3/27/2020 | | PASS |
DeAnn Brown
|
|
|
Buildings are connecting to one existing sewer stub and one new sewer tap.
|
Routing Off Site - STRUCTURAL | 3/25/2020 | | 3/25/2020 | | PASS |
Michael Hanson
|
|
|
Per Chris M @ Stapley engineering
|
Routing PW Drainage | 3/20/2020 | | 3/20/2020 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Street Lights | 3/18/2020 | | 3/18/2020 | | FAIL |
Tom Marshall
|
|
|
|
Routing - MECHANICAL | 3/18/2020 | | 3/18/2020 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/17/2020 | | 3/17/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 11/27/2019 | 11/30/2019 | 12/2/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 10/16/2019 | 10/23/2019 | 11/27/2019 | | PASS |
Mark Stumbaugh
|
|
|
11/26 - 502 JD/Fischer Bldg 10
|
1st review completed | | | 11/27/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing PW Drainage | 11/25/2019 | | 11/25/2019 | | FAIL |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 10/23/2019 | | 11/25/2019 | | FAIL |
Michael Hanson
|
|
|
Stapley
|
Routing - PLAN CHECK | 10/23/2019 | | 11/25/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Drainage | 10/23/2019 | | 11/8/2019 | | FAIL |
Brian Murphy
|
|
|
NEED APDX J
|
Routing - Erosion and Sediment | 10/23/2019 | | 10/29/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep required, RP needed.
|
Routing PW Environmental | 10/23/2019 | | 10/28/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 10/23/2019 | | 10/28/2019 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing - PLUMBING | 10/23/2019 | | 10/28/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - PLANNING | 10/23/2019 | | 10/24/2019 | | PASS |
Kevin Holmes
|
|
|
|
Routing - Addressing | 10/23/2019 | | 10/24/2019 | | PASS |
Doug Chausow
|
|
|
New Address: 2418 S Liberty St
|
Routing PW Street Lights | 10/23/2019 | | 10/24/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Design Review | 10/23/2019 | | 10/24/2019 | | FAIL |
Katelyn Menuge
|
|
|
|
Routing PW Solid Waste | 10/23/2019 | | 10/24/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 10/23/2019 | | 10/23/2019 | | FAIL |
DeAnn Brown
|
|
|
See changemarks on utility plan sheet
|
Routing - PUBLIC WORKS | 10/23/2019 | | 10/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/16/2019 | | |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 10/15/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 10/14/2019 | | FAIL |
|
|
|
(10-14-19) Refer to the circled items that do not have an "OK" in the circle in the Plan Intake Checklist . Resolve each item as directed. CJW
|
Intake Approval | | | 10/8/2019 | | FAIL |
|
|
|
(10-8-19) Refer to the circled items that do not have an "OK" in the circle in the Plan Intake Checklist . Resolve each item as directed. CJW
|
Intake Approval | | | 10/1/2019 | | FAIL |
|
|
|
(10-1-19) Refer to the circled items in the Plan Intake Checklist and in the separate Sheet 5 Plan Intake Checklist. Resolve each item as directed. CJW
|
Application received | | | 9/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 21 2019 3:59PM
|
Routing PW Sewer Design | 3/18/2020 | | | | FAIL |
|
|
|
Note 13 on the utility plan calls out an "electrical reducer" this should call out a 4"x6" eccentric reducer.
|
Plan assigned to (M_H) | 8/12/2020 | | | | |
Michael Hanson
|
|
|
08/18 Plan Mod
|
Routing - PLAN CHECK | 8/12/2020 | | | | |
Michael Hanson
|
|
|
|