BLD-Framing/Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Tony Young
|
|
|
Bill - *//Screened*// Phone #: ###-####// ok to cover all
|
BLD-Energy code compliance | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PART |
Tony Young
|
|
|
Screened- Bill Phone #: ###-####// ok except for fireplace area
|
BLD-Framing/Rough-in | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PART |
Tony Young
|
|
|
Bill *screened* Phone #: ###-####// soffit base fire treated plywood ok,, fire treated cedar soffit materian noted on site// needs mechanical pass but ok to insulate unaffected areas// needs another ok on sprinklers// structural engineer of record has walked site and okayed as built
|
BLD-Aging Inspection | 6/4/2020 | 6/4/2020 | 6/8/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/3/2020 | 6/3/2020 | 6/8/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Tony Young
|
|
|
soffit - screened // Bill Phone #: ###-####
|
BLD-Conference | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Tony Young
|
|
|
screened - siding and fireplace hearth // Bill Phone #: ###-####,, ?s on clearence on epay wood,, ok,, fireplace,, needs specs or ok from manf.
|
BLD-Conference | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Tony Young
|
|
|
screened // handrails and landscaping - Bill Phone #: ###-####,, no guardrail needed out along boulder landscape wall
|
BLD-Conference | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Tony Young
|
|
|
Walt Gann; Phone #: ###-####,, will use a commercial grade painted ok exterior cover
|
BLD-Wall Bracing | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PEND |
Brandon Shaw
|
|
|
See plans for missing hold down, marked in red... See shear schedule for walls requiring /spacing of A-35 clips... To be installed before framing f\rough-in...
|
CHANGE STATUS TO (ISS) | | | 3/24/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 3/9/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 1/31/2020 | 1/31/2020 | 3/9/2020 | | DONE |
Jenny Nelson
|
|
|
1st complete 02/07 Plan mod - waiting on hillside review
|
Routing PW Grading-Hillside | 3/9/2020 | | 3/9/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 3/9/2020 | | DONE |
|
|
|
plan mod approved
|
Routing PW Grading-Hillside | 2/11/2020 | | 2/21/2020 | | FAIL |
Melissa Jannusch
|
|
|
Slope stability analysis and updated boulder wall calculations. see changemarks in ePlan.
|
Routing - PLAN CHECK | 2/11/2020 | | 2/12/2020 | | PASS |
Jenny Nelson
|
|
|
|
Routing - Erosion and Sediment | 2/11/2020 | | 2/11/2020 | | PASS |
Michael Zawacki
|
|
|
|
BLD-Final | 1/29/2020 | 1/31/2020 | 1/31/2020 | A | CANC |
Dave Hannah
|
|
|
Donna Phone #: ###-####
|
Plan Modification Accepted | | | 1/31/2020 | | DONE |
|
|
|
grading and drainage modifications due to landscape changes
|
BLD-Foundation | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PART |
Tony Young
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro // retaining walls on the west side ok,, work in progress
|
BLD-Foundation | 1/10/2020 | 1/13/2020 | 1/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is reqired...
|
BLD-Foundation | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PART |
Tony Young
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro// mostly covered with concrete blankets.. will pour on monday
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro Inspection cancelled via mobile web on Tuesday, December 10, 2019.
|
PubWorks Subgrade Approval | 12/10/2019 | 12/10/2019 | 12/10/2019 | | DONE |
Melissa Jannusch
|
|
|
*Residential footings* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 11/7/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/7/2019 | | DONE |
|
|
|
met
|
Plan assigned to (J_N) | 10/7/2019 | 10/7/2019 | 11/6/2019 | | DONE |
|
|
|
10/24 sfd L2 ePlan. 2nd review complete, hillside correction. 1st complete, engineering inconsistencies
|
Routing PW Grading-Hillside | 11/6/2019 | | 11/6/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 11/4/2019 | | 11/4/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 11/4/2019 | | 11/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLAN CHECK | 11/4/2019 | | 11/4/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 10/29/2019 | | 10/31/2019 | | FAIL |
Troy James
|
|
|
See eplan. Emailed corrections to TML and applicant.
|
1st review completed | | | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 10/7/2019 | | 10/18/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLAN CHECK | 10/7/2019 | | 10/18/2019 | | FAIL |
Jenny Nelson
|
|
|
Structural calcs and plans not matching, need siding specs
|
Routing - PLANNING | 10/7/2019 | | 10/14/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - MECHANICAL | 10/7/2019 | | 10/10/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to TML
|
Route to Impact Fee Review | 10/7/2019 | 10/10/2019 | 10/8/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Erika Akin
|
|
|
Fire sprinklers are being provided, as noted on the floor plan general notes. No comments.
|
Routing - Addressing | 10/7/2019 | | 10/7/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/7/2019 | | 10/7/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/7/2019 | | 10/7/2019 | | PASS |
Michael Zawacki
|
|
|
Hillside lot, site prep inspection required.
|
Intake Approval | | | 10/7/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/7/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/30/2019 | | FAIL |
|
|
|
Milton called-plans still not turned-i deleted the A drawings and Tisha killed the work flow so it would go back to him and he can re load the A's.
|
Intake Approval | | | 9/25/2019 | | FAIL |
|
|
|
Called Merlin to let know drawings need rotated and they need uploaded so we can scroll in and out to do a better prescreen correctly-left message on his phone-called back and will fix-i was having trouble reading the drawings so hope I got all
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 8:06AM
|