Telephone call | | | 2/24/2020 | | DONE |
|
|
|
Called and spoke to Raistrick construction regarding doubled trade values. PLM, water heater was added after permit pulled. ELE, work added after permit pulled.
|
Print Statement | | | 2/24/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/2/2020 | | DONE |
|
|
|
|
BLD-Final | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work complete, signature provided on permit sign off card.
Tom Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/17/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 12/10/2019 | | 12/16/2019 | | DONE |
Michael Hanson
|
|
|
plan mod - remove drinking fountain from the floor plan. A occupant load reduction request will be subitted as part of this plan modifiction. The request is to exempt this TI from the drinking fountain requirement.
|
Routing - PLAN CHECK | 12/16/2019 | | 12/16/2019 | | PASS |
Michael Hanson
|
|
|
PLAN MOD REVIEW FEE = 1 HOUR
|
Permit Ready to Issue | | | 12/16/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan Modification Accepted | | | 12/10/2019 | | DONE |
|
|
|
plan mod - remove drinking fountain from the floor plan. A occupant load reduction request will be subitted as part of this plan modifiction. The request is to exempt this TI from the drinking fountain requirement.
|
BLD-Framing/Rough-in | 11/27/2019 | 12/2/2019 | 12/2/2019 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Interior steel stud framed wall ok.
|
Issue PAID IN FULL permit | | | 11/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/21/2019 | | DONE |
|
|
|
NEED
GC
Certificate of Value
|
Routing - FIRE | 11/20/2019 | 11/20/2019 | 11/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Routing - PLAN CHECK | 11/20/2019 | | 11/20/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2019 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 10/10/2019 | | 11/20/2019 | | DONE |
Michael Hanson
|
|
|
2nd review completed - 10/10 #518 L2 ePlan - Miller Paint Co. Expansion T.I
|
Routing - FIRE | 10/30/2019 | 10/30/2019 | 11/12/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan regarding the exiting hardware for the (3) back doors.
|
Plan Reviewer's activity | | | 10/16/2019 | | DONE |
Michael Hanson
|
|
|
Responded to applicants email with direction on how to resolve the changemarks.
|
Route to Impact Fee Review | 10/10/2019 | 10/13/2019 | 10/11/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JG) | 9/30/2019 | 9/30/2019 | 10/10/2019 | | DEFR |
Javier Guzman
|
|
|
10/10 L2 Miller Paint Co. Expansion T.I ePlan
|
Routing - PLAN CHECK | 9/30/2019 | | 10/10/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
1st review completed | | | 10/10/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - FIRE | 9/30/2019 | 9/30/2019 | 10/3/2019 | | FAIL |
Erika Akin
|
|
|
10/10 L2 Miller Paint Co. Expansion T.I ePlan
|
Routing - Addressing | 9/30/2019 | | 10/1/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2019 | | 9/30/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING. WILL WATCH FOR NEW PLUMBING WHEN TENANT COMES THROUGH
|
Intake Approval | | | 9/27/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 8:19AM
|