Second Notice | | 12/6/2019 | 12/4/2019 | | DONE |
|
|
|
This permit finaled on the web by Robert Reeder
|
First Notice | 11/20/2019 | 11/20/2019 | 11/26/2019 | | DONE |
Mike Jordan
|
|
|
mailed 12-2-19
|
BLD-Final | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
DOC - Permit Finaled | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
Issue PAID IN FULL permit | | | 11/14/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2019 | | DONE |
|
|
|
Send permit to be sign to- robert@lytlesigns.com
eplan needs to be release
|
Permit Ready to Issue | | | 11/13/2019 | | DONE |
|
|
|
All Met
|
Route to Impact Fee Review | 11/12/2019 | 11/15/2019 | 11/12/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JG) | 11/7/2019 | 11/7/2019 | 11/12/2019 | | PASS |
Javier Guzman
|
|
|
11/12 L1 Awning Noodles and Company ePlan
|
Routing - PLAN CHECK | 11/7/2019 | | 11/12/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/12/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
|
|
|
|
Routing - Design Review | 11/7/2019 | | 11/8/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00450
|
Intake Approval | | | 11/6/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/24/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following for your prescreen to be approved:
1. Provide a completed Form #304 (your engineer can be the Professional of record).
2. Verify the snow loads meet the City of Boise design criteria (snow load of 25psf). Resubmit engineering as needed.
|
Intake Approval | | | 9/25/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide or address the following for your Prescreen to be approved;
1. Letters of Approval from Planning and Zoning.
2. The (3) Drawings must be minimum 18'x24' sheet size.
3. No Vicinity Map was provided.
4. I cannot find the Code Analysis on the engineering. It should state the 2015 IBC was used for analysis somewhere as well as the snow load, live load and dead load.
5. Design loads should be clarified in the Engineering. Is it Page 3?
6. Page 2 of the Engineering sheets does not look like the entire sheet is uploaded. Should it be an 18"x24" size sheet as well?
7. The Engineering should specifiy if Special Inspections are required.
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 11:05AM
|