DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Dave Hannah
|
|
|
Please call Jerry Jones 30 minutes before arrival Phone #: ###-#### Inspection requested via web by Jerry Jones
|
FIRE-Final Inspection | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Jim Page
|
|
|
Fire alarm inspection is complete, no fire sprinkler modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Please call Jerry Jones 30 minutes before arrival Phone #: ###-#### Inspection requested via web by Jerry Jones
|
Fees Due Hold | 12/3/2019 | | 12/16/2019 | | DONE |
Gemma Flores
|
|
|
|
Fees Due Hold | 11/30/2019 | | 12/2/2019 | | DONE |
Judith Amador
|
|
|
|
Issue & PRINT to be Invoiced | | | 11/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2019 | | DONE |
|
|
|
emailed permit to be sign to _michelleleon@micron.com Eplan will need to be release
|
Route to Impact Fee Review | 11/25/2019 | 11/28/2019 | 11/26/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CDM) | 11/6/2019 | 11/6/2019 | 11/25/2019 | | PASS |
Carl D Madsen
|
|
|
Micron B 24 Loading dock L-2
|
Routing - FIRE | 11/6/2019 | 11/6/2019 | 11/25/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
1st review completed | | | 11/25/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/25/2019 | | DONE |
|
|
|
ALL MET- Need GC
(if micror does not sign 302 form we need a new revised value from the GC)
|
Routing - PLAN CHECK | 11/6/2019 | | 11/18/2019 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 11/1/2019 | | PASS |
|
|
|
|
Intake Approval | | | 10/24/2019 | | FAIL |
Julie Romig
|
|
|
Need:
1. Wall schedule and section for new walls. Wall tag provided, but no wall type details are provided. If this is a rated wall, also provide rating type, tested assembly, continuity details, etc.
2. Required exit signs and emergency lighting.
3. Interior Lighting COMcheck, light fixture schedule, and light switching showing compliance with the 2015 IECC.
4. Hazardous Material Inventory Statement for material stored in the room.
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 3:02PM
|