BLD-Final | 3/3/2020 | 3/4/2020 | 3/5/2020 | A | DEFR |
Brandon Shaw
|
|
|
Waiting for Engineering
|
Telephone call | | | 2/28/2020 | | DONE |
|
|
|
Explained permit is still open. David (engineer) said that the work was already completed. Will need final inspections. Emailed 302 form, need RP for ESC. Emailed link to pay fees.
|
Issue PAID IN FULL permit | | | 2/28/2020 | | DONE |
|
|
|
|
Expiration Notice | 2/24/2020 | 3/16/2020 | 2/24/2020 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 10/16/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/24/2019 | 9/24/2019 | 10/16/2019 | | PASS |
Josh Bogle
|
|
|
09/30 retaining wall, ePlan
|
Routing - PLAN CHECK | 9/24/2019 | | 10/16/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/16/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 10/16/2019 | | DONE |
|
|
|
ALL MET
Need
GC Form (not sure if the parcel owner or a GC is doing the work, if a GC is doing the work we need an RP)
|
Routing - PLANNING | 9/24/2019 | | 10/10/2019 | | PASS |
David Moser
|
|
|
|
Plan Reviewer's activity | | | 10/9/2019 | | DONE |
Josh Bogle
|
|
|
took Hillside activity out of Tidemark - added a Planning review in ePlan
|
Routing PW Flood Plain | 9/24/2019 | | 10/1/2019 | | CANC |
Jason C. Taylor
|
|
|
no review required. JCT
|
Routing - Addressing | 9/24/2019 | | 9/24/2019 | | PASS |
Doug Chausow
|
|
|
updated parcel number and address to match drawings.
|
Intake Approval | | | 9/24/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/24/2019 | | DONE |
|
|
|
no fees paid at intake
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 4:59PM
|