Permit Information
Permit NumberBLD19-03778
StatusFinaled
Name DIAMOND HOMES
Site Address 1908 N 29TH ST
Project NameSmith Home
Customer NumberDEMO BLD19-04069
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2220 sq. ft., two story (first story 1560 sq. ft., second story 660 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 133 sq. ft. of covered patio/porch and a 528 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/25/20203/26/20203/26/2020APASS
DetailsDave Hannah
Call for access Phone #: 2088675509 >> Inspection requested via mobile web by Rod Lamm
DOC - Permit Finaled3/26/20203/26/20203/26/2020PPASS
DetailsDave Hannah
BLD-Blower Door Test Results3/26/20203/26/20203/26/2020PPASS
DetailsDave Hannah
3,9
BLD-Final3/20/20203/23/20203/23/2020PFAIL
DetailsTell Riley
Call for access Phone #: 2088675509 >> Inspection requested via mobile web by Rod//CN posted//steps to high at exterior rear landings//need blower door test//side door steps at grade needs adjusted//
BLD-Energy code compliance1/8/20201/9/20201/9/2020APASS
DetailsDave Hannah
Phone #: 2088675506 >> Inspection requested via mobile web by Rod
BLD-Framing/Rough-in1/6/20201/7/20201/7/2020PPART
DetailsTony Young
Phone #: 2088675509 >> Inspection requested via mobile web by Rod // brace trusses, add point load in basement// ok to insulate
BLD-Wall Bracing12/16/201912/16/201912/17/2019PPASS
DetailsDave Hannah
shear // Rod Phone #: ###-####
BLD-Foundation11/15/201911/15/201911/15/2019PPASS
DetailsTony Young
Willie Phone #: ###-####,, garage wall ok
BLD-Footing11/13/201911/14/201911/14/2019ADONE
DetailsTony Young
Willie Phone #: ###-####,, garage footing
BLD-Foundation11/1/201911/1/201911/1/2019PPART
DetailsTony Young
Willy Phone #: ###-####,, basement walls and house crawl space walls ,, work in progress
BLD-Foundation10/31/201911/1/201911/1/2019ANR
DetailsTony Young
Willy Phone #: ###-####
BLD-Footing10/28/201910/29/201910/29/2019APART
DetailsTony Young
Willie- as early as possible Phone #: ###-####,, basement footings and upper house footings ok.. work in progress
BLD-Footing10/26/201910/28/201910/28/2019AFAIL
DetailsMike Jordan
Phone #: 2088675509 >> Inspection requested via mobile web by Rod Lamm. Verts for basement wall to be at 9 inc oc per the engineering.
BLD-Footing10/23/201910/25/201910/25/2019AFAIL
DetailsTell Riley
Phone #: 2088675509 >> Inspection requested via mobile web by Rod//no one oniste//no footings formed//also will need to mark property lines///
Issue PAID IN FULL permit  10/18/2019 DONE
Inspection Record Card- Bld  10/18/2019 DONE
Telephone call  10/18/2019 DONE
ALL MET Email for permit signatures to- rodlamm141@gmail.com Eplan will need to be release
OVERRIDE  10/16/2019  
Plan assigned to (J_N)10/1/201910/1/201910/16/2019 DONE
DetailsJenny Nelson
10/14 sfd L1 ePlan. 1st complete 10/15, patio engineering, note about geotech report none provided.
Routing - PLAN CHECK10/16/2019 10/16/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  10/16/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  10/16/2019 DONE
1st review completed  10/15/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK10/1/2019 10/15/2019 FAIL
DetailsJenny Nelson
Route to Impact Fee Review10/1/201910/4/201910/2/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/1/2019 10/2/2019 PASS
DetailsTroy James
Routing - PLANNING10/1/2019 10/2/2019 PASS
DetailsSue Cummings
If the concrete stoop outside the utility room is over 1 ft. in height, is needs to meet the setback.
Routing - Addressing10/1/2019 10/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/1/2019 10/2/2019 PASS
DetailsMorgan Webb
Intake Approval  10/1/2019 FAIL
Please upload your drawings with the correct file names, see EPlan Review Documents Electronic submittal Standards at cityofboise.org
Plans ACCEPTED BY PLAN TECH  10/1/2019 DONE
Recd Pcfee & Taken To Pln CK  10/1/2019 DONE
Intake Approval  10/1/2019 PASS
Application received  9/24/2019 DONE
Application submitted via PDS Online on Sep 24 2019 11:48AM