BLD-Energy code compliance | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Tony Young
|
|
|
call 15 mins ahead_ Screened Phone #: ###-####
|
BLD-Energy code compliance | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PART |
Tony Young
|
|
|
Gabe - Call ahead for access Phone #: ###-####// frame ok,, seal ok,, ok to insulate
|
BLD-Framing/Rough-in | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | PART |
Tony Young
|
|
|
call for access - screened // Jack Phone #: ###-####// nail hangers, verify seal pack,, carry point loads to foundation,, strap plates,, ok to insulate
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | NR |
Dave Hannah
|
|
|
Gabe Phone #: ###-####
|
Routing - MECHANICAL | 5/11/2020 | | 5/11/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Dave Hannah
|
|
|
ok with video/photo ... shear // Gabe Phone #: ###-####
|
BLD-Foundation | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####, basement wall
|
BLD-Footing | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, interior footings,, work in progress on basement wall
|
BLD-Foundation | 1/17/2020 | 1/17/2020 | 1/22/2020 | P | PART |
Dave Hannah
|
|
|
scott Phone #: ###-#### rebar ok
|
CHANGE STATUS TO (ISS) | | | 1/21/2020 | | DONE |
|
|
|
plan mod
|
Inspection Record Card- Bld | | | 1/21/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/16/2020 | | |
|
|
|
|
Telephone call | | | 1/16/2020 | | DONE |
|
|
|
called Joe and informed him what fees are when picking up plan mod
|
Permit Ready to Issue | | | 1/16/2020 | | DONE |
|
|
|
DO NOT ISSUE plan mod approved
|
BLD-Footing | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
Routing Walk-In (BLD) | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 12/9/2019 | 12/9/2019 | 1/15/2020 | | PASS |
Josh Bogle
|
|
|
*12/13 plan mod, paper - 1st done
|
Routing - PLAN CHECK | 1/15/2020 | | 1/15/2020 | | PASS |
Josh Bogle
|
|
|
fee per added value plus two hours Plan Review time
|
Case Summary (BLD) | | | 1/15/2020 | | DONE |
Josh Bogle
|
|
|
|
Plan resubmittals received | | | 1/8/2020 | | DONE |
|
|
|
Two copies of Cover Sheet, existing main floor, floor plans, roof plan, elevations, eleveations proposed,building section, wall section, architect details, lighting, foundation stamped taken to plan reviewer.
|
Routing - PLAN CHECK | 1/8/2020 | | 1/8/2020 | | FAIL |
Josh Bogle
|
|
|
bedroom with no egress - called architect
|
Routing Walk-In (BLD) | 1/7/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Josh Bogle
|
|
|
took in new plans for level two review
|
Routing - PLAN CHECK | 12/9/2019 | | 12/16/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Joe & Paul
|
Routing Walk-In (BLD) | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | FAIL |
Josh Bogle
|
|
|
additional plans for modification -
|
Routing Walk-In (BLD) | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Josh Bogle
|
|
|
took in mod for level two review
|
Plan Modification Accepted | | | 12/9/2019 | | DONE |
|
|
|
Changing basement layout. One copy of plan sheets (per josh) CS, A-0, A-1, A-2, A-3, A-3.1, A-4, A-5, D-1, E-1,S-1.0
|
(F) Reprint permit | | | 11/25/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/13/2019 | | DONE |
|
|
|
|
Meeting | | | 11/13/2019 | | DONE |
|
|
|
Owner is taking permit over from Wallace Renovations, see letter in documents
|
Issue PAID IN FULL permit | | | 10/1/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
OVERRIDE | | | 9/30/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/25/2019 | 9/25/2019 | 9/30/2019 | | PASS |
Josh Bogle
|
|
|
10/01 addition, paper
|
1st review completed | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2019 | | DONE |
Josh Bogle
|
|
|
***double fee on ESC Per Michael Z*** yes - Energy yes
|
Override - Parcel Holds | | | 9/30/2019 | | |
|
|
|
|
Override - Parcel Holds | | | 9/30/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 9/30/2019 | | |
|
|
|
ALL MET- need RP
per Michael Z double fee for stop work order-please remove parcel hold when paid
|
Routing - MECHANICAL | 9/25/2019 | | 9/30/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 9/30/2019 | | 9/30/2019 | | PASS |
Josh Bogle
|
|
|
|
Telephone call | | | 9/30/2019 | | DONE |
|
|
|
called Jeff to let know permit is ready
|
Routing Walk-In (Zoning) | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 and routed
|
Application received | | 9/25/2019 | | | |
|
|
|
|