BLD-Framing/Rough-in | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
KAREN Phone #: ###-####//corrections made final complete/
|
DOC - Permit Finaled | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PART |
Tell Riley
|
|
|
Karen Phone #: ###-####//fixing hold downs while onsite--will be installed correctly//still need electrical rough ins//no cover of inside until electrical rough has passed//
|
BLD-Framing/Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PEND |
Tell Riley
|
|
|
Call ahead // Tarin Phone #: ###-####//framing looks ok//need to verify nailing on STHD holddowns--they were covered by siding and-no way to verify nails//need electrical rough also//
|
BLD-Footing | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Tell Riley
|
|
|
Ill Phone #: ###-####//ok per plans//
|
Routing Walk-In (Zoning) | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
Application received | | 9/26/2019 | | | |
|
|
|
|