Permit Information
Permit NumberBLD19-03841
StatusIssued
Name AVIMOR PARTNERS LLC
Site Address 3708 W MORRIS HILL RD
Project NamePfanmuller Addition
Customer Number 
ePlanReviewNo
Description
FOUNDATION UNDER PERMIT BLD19-03108 - Permit for a full gut-to-the studs remodel and large addition. Project relocates stairs to an existing 332sq' unfinished basement, adds 1,499sq' on the main level, adds 887sq' of 2nd level, adds 1,192sq' of garage (original garage torn down under permit BLD19-02540), and adds 1,607sq' of covered patio. At project completion home is 5bd/3.5bth. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/9/20207/9/20207/9/2020PFAIL
DetailsTell Riley
Please call when you are on the way so that I can have the home open cell ###-#### Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//left CN with Brad//corrections will need to be completed for final//
BLD-Wall cover1/23/20201/23/20201/23/2020PPART
DetailsTell Riley
Drywall Sheer inspection Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//ok when added screws installed as marked on plans//
BLD-Energy code compliance1/14/20201/14/20201/14/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller
BLD-Framing/Rough-in1/9/20201/10/20201/10/2020APASS
DetailsTell Riley
Please call when you make it to the house so that we can discuss the additional engineering reports to address the correction letter.
thank you,
Brad Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//corrections made//letter from engineer stamped outlining some corrections that he has approved//ok to insulate//
BLD-Framing/Rough-in1/6/20201/6/20201/6/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//CN posted-to many to list see onsite//
BLD-Energy code compliance1/3/20201/6/20201/6/2020ACANC
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//needed framing//
Plan Modification Accepted  12/11/2019 DONE
plan mod - manual J submitted by Benny Arreola of AB Heating and Cooling
Routing - MECHANICAL12/11/2019 12/11/2019 PASS
DetailsTroy James
Manual j report resubmittal.
BLD-Conference11/27/201911/27/201911/27/2019APASS
DetailsTell Riley
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//shear ok per plans//clarification for hold downs provided and stamped by design engineer//nailing ok//hold downs installed correctly//finish sheating at bottom of walls with same nailing patterns//
BLD-Conference11/27/201911/27/201911/27/2019ACANC
DetailsTell Riley
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### >> Inspection requested via web by Brad Pfannmuller Inspection cancelled from web by: Brad Pfannmuller
BLD-Conference11/25/201911/25/201911/25/2019AFAIL
DetailsTell Riley
The hold downs missing have been installed and we are ready for the wall bracing inspection please.
Thanks Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//need to install hold downs correctly per manufacturers requirements//install hold downs in correct locations//frame portal frames per plans and in correct locations//address hold downs H1 nad H3 have engineer give size//address issue with wall in garage overhanging foundation and bearing of trusses//nailing will need to reflect engineering//
BLD-Wall Bracing11/11/201911/12/201911/12/2019PPART
DetailsDave Hannah
Phone #: 2088991061 >> Inspection requested via mobile web by Brad Pfannmuller ok to rap ext of garage but needs to install hold downs on the rest
OVERRIDE  10/3/2019  
Plan assigned to (JAB) Josh9/27/20199/27/201910/3/2019 PASS
DetailsJosh Bogle
09/30 addition, paper - 1st done
Routing - MECHANICAL10/3/2019 10/3/2019 PASS
DetailsTroy James
Inspection Record Card- Bld  10/3/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/3/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/3/2019 DONE
DetailsJosh Bogle
ESC no (under permit BLD19-03108) - Energy yes
Permit Ready to Issue  10/3/2019 DONE
Telephone call  10/3/2019 DONE
sent an email to brad, voice mail box is full, informing him permit is ready and fee amount due
Issue PAID IN FULL permit  10/3/2019 DONE
Routing - PLAN CHECK9/30/2019 10/1/2019 PASS
DetailsJosh Bogle
1st review completed  10/1/2019 FAIL
DetailsJosh Bogle
failed Mech
Routing - MECHANICAL9/27/2019 9/30/2019 FAIL
DetailsTroy James
Emailed corrections to buildingenergy
Routing Walk-In (Zoning)9/27/20199/27/20199/27/2019PPASS
DetailsJeff Lowe
Routing Walk-In (BLD)9/27/20199/27/20199/27/2019PPASS
DetailsJosh Bogle
took in as a level 2 and routed
Application received 9/27/2019