BLD-Final | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | FAIL |
Tell Riley
|
|
|
Please call when you are on the way so that I can have the home open cell ###-#### Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//left CN with Brad//corrections will need to be completed for final//
|
BLD-Wall cover | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tell Riley
|
|
|
Drywall Sheer inspection Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//ok when added screws installed as marked on plans//
|
BLD-Energy code compliance | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller
|
BLD-Framing/Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Tell Riley
|
|
|
Please call when you make it to the house so that we can discuss the additional engineering reports to address the correction letter. thank you, Brad Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//corrections made//letter from engineer stamped outlining some corrections that he has approved//ok to insulate//
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//CN posted-to many to list see onsite//
|
BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//needed framing//
|
Plan Modification Accepted | | | 12/11/2019 | | DONE |
|
|
|
plan mod - manual J submitted by Benny Arreola of AB Heating and Cooling
|
Routing - MECHANICAL | 12/11/2019 | | 12/11/2019 | | PASS |
Troy James
|
|
|
Manual j report resubmittal.
|
BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Tell Riley
|
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//shear ok per plans//clarification for hold downs provided and stamped by design engineer//nailing ok//hold downs installed correctly//finish sheating at bottom of walls with same nailing patterns//
|
BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | CANC |
Tell Riley
|
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### >> Inspection requested via web by Brad Pfannmuller Inspection cancelled from web by: Brad Pfannmuller
|
BLD-Conference | 11/25/2019 | 11/25/2019 | 11/25/2019 | A | FAIL |
Tell Riley
|
|
|
The hold downs missing have been installed and we are ready for the wall bracing inspection please. Thanks Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//need to install hold downs correctly per manufacturers requirements//install hold downs in correct locations//frame portal frames per plans and in correct locations//address hold downs H1 nad H3 have engineer give size//address issue with wall in garage overhanging foundation and bearing of trusses//nailing will need to reflect engineering//
|
BLD-Wall Bracing | 11/11/2019 | 11/12/2019 | 11/12/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2088991061 >> Inspection requested via mobile web by Brad Pfannmuller ok to rap ext of garage but needs to install hold downs on the rest
|
OVERRIDE | | | 10/3/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 9/27/2019 | 9/27/2019 | 10/3/2019 | | PASS |
Josh Bogle
|
|
|
09/30 addition, paper - 1st done
|
Routing - MECHANICAL | 10/3/2019 | | 10/3/2019 | | PASS |
Troy James
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/3/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2019 | | DONE |
Josh Bogle
|
|
|
ESC no (under permit BLD19-03108) - Energy yes
|
Permit Ready to Issue | | | 10/3/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2019 | | DONE |
|
|
|
sent an email to brad, voice mail box is full, informing him permit is ready and fee amount due
|
Issue PAID IN FULL permit | | | 10/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/30/2019 | | 10/1/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/1/2019 | | FAIL |
Josh Bogle
|
|
|
failed Mech
|
Routing - MECHANICAL | 9/27/2019 | | 9/30/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to buildingenergy
|
Routing Walk-In (Zoning) | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 and routed
|
Application received | | 9/27/2019 | | | |
|
|
|
|