BLD-Energy code compliance | 6/2/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Brandon Shaw
|
|
|
Charlie Phone #: ###-####
|
BLD-Energy code compliance | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PASS |
Brandon Shaw
|
|
|
Framing... OK toinsulate...
|
BLD-Wall Bracing | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Brandon Shaw
|
|
|
Soffit...
|
BLD-Conference | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | DONE |
Brandon Shaw
|
|
|
screened // Charlie // Phone #: ###-####
|
Routing - MECHANICAL | 4/29/2020 | | 4/29/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Brandon Shaw
|
|
|
screened // Alex Phone #: ###-####
|
BLD-Foundation | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 2/5/2020 | 2/5/2020 | 2/5/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 12/16/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/16/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/16/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/29/2019 | 11/29/2019 | 12/13/2019 | | DONE |
Brian McGowan
|
|
|
12/13- 1st Review Complete- - L2 SFD ePlan
|
Routing - PLAN CHECK | 12/13/2019 | | 12/13/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2019 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 12/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/30/2019 | | 12/2/2019 | | FAIL |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 11/27/2019 | 11/27/2019 | 11/27/2019 | | DEFR |
Josh Bogle
|
|
|
11/18- L2 SFD ePlan
|
Plan assigned to (BJM) | 11/18/2019 | 11/18/2019 | 11/27/2019 | | DEFR |
Brian McGowan
|
|
|
1st Review Complete- - L2 SFD ePlan
|
Routing PW Grading-Hillside | 10/31/2019 | | 11/15/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 10/31/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/30/2019 | 11/2/2019 | 10/31/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 10/30/2019 | | 10/31/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 10/30/2019 | | 10/31/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP listed. Site preparation inspection is REQUIRED prior to significant earthwork and after BMP installation per approved ESC plan.
|
Routing - FIRE | 10/30/2019 | 10/30/2019 | 10/30/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers ar enot required.
|
Plan assigned to (RDP) | 10/30/2019 | 10/30/2019 | 10/30/2019 | | DEFR |
Rob Patrick
|
|
|
11/18 sfd L2 ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 10/30/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/30/2019 | | PASS |
|
|
|
|
Routing - PLANNING | 10/30/2019 | | 10/30/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - Addressing | 10/30/2019 | | 10/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 10/28/2019 | | FAIL |
|
|
|
10-28-19 Plan sheets are showing as 11x8.5, they must be a minimum of 24x18
|
Intake Approval | | | 10/23/2019 | | FAIL |
|
|
|
Spoke with Doug and he said he accidentally resubmitted without turning plans to landscape and adding stairway lighting and switches.
|
Intake Approval | | | 10/22/2019 | | FAIL |
|
|
|
Please load all drawings in landscape orientation. Please show stairway lighting and switch locations.
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2019 | | FAIL |
|
|
|
1. Plan sheets need to be a minumun of 24x18
2. Plans must be in landscape format
3. Allow for stamp area
|
Application received | | | 9/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 28 2019 7:38PM
|