BLD-Final | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Jim Storey
|
|
|
Garage code 1977. Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett
|
DOC - Permit Finaled | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | DONE |
Jim Storey
|
|
|
Garage code 1977. Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett 4.45
|
BLD-Energy code compliance | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Tony Young
|
|
|
Taped on window a pass from engineer on floor joist hole cut for vac pipe. Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PART |
Tell Riley
|
|
|
Craig Phone #: ###-####//CN posted to add fire blocking at garage/front entry wall, at ceiling level//need verification from manufacturer of plumbing and vacuum pipe penetrations at locations near bearing points for I joists//ok to insulate//
|
BLD-Wall Bracing | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PART |
Tell Riley
|
|
|
Shear // Craig Phone #: ###-####//add osb at 2nd story for shear wall above garage//nails in tall wall where shown//ok when complete//
|
BLD-Foundation | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####
|
BLD-Footing | 12/1/2019 | 12/2/2019 | 12/2/2019 | A | PASS |
Tony Young
|
|
|
Thank you! Foundation guy is Jon Burton ###-#### Phone #: ###-#### Inspection requested via web by Craig Hammett
|
Issue PAID IN FULL permit | | | 11/27/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/27/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/6/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/1/2019 | 10/1/2019 | 11/6/2019 | | DONE |
Jenny Nelson
|
|
|
10/14 sfd L1 ePlan. 1st complete 10/14, patio engineering
|
Routing - PLAN CHECK | 11/6/2019 | | 11/6/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/6/2019 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 10/1/2019 | | 10/14/2019 | | FAIL |
Jenny Nelson
|
|
|
|
1st review completed | | | 10/14/2019 | | DONE |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 10/1/2019 | 10/4/2019 | 10/2/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/1/2019 | | 10/2/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/1/2019 | | 10/1/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/1/2019 | | 10/1/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/1/2019 | | 10/1/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/1/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/1/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/1/2019 | | PASS |
|
|
|
|
Application received | | | 9/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 30 2019 3:24PM
|