Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-03896
StatusFinaled
Name HAMMETT HOMES
Site Address 3386 W FORSYTHIA DR
Project Name5-2 Forsythia
Customer Number 
ePlanReviewYes
Description
**PRISCRIPTIVE ENERGY REQUIREMENTS**Permit for the construction of a new 3045 sq. ft., two story (first story 1723 sq. ft., second story 1322 sq. ft.) single family dwelling with 6 bedrooms, 4 bathrooms, approximately 246 sq. ft. of covered patio/porch and a 494 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results7/9/20207/9/20207/9/2020PDONE
DetailsTony Young
Garage code is 1977
Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett // 3.48
DOC - Permit Finaled7/9/20207/9/20207/9/2020PPASS
DetailsTony Young
BLD-Final7/8/20207/9/20207/9/2020APASS
DetailsTony Young
Garage code is 1977
Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett
BLD-Energy code compliance4/17/20204/20/20204/20/2020APASS
DetailsTony Young
This is a framing reinspect and energy inspection.
Thanks you! Phone #: ###-#### Inspection requested via web by Craig Hammett
BLD-Framing/Rough-in4/15/20204/16/20204/16/2020APART
DetailsTony Young
There is floor joist flange cut above great room door going to patio from plumber. I have an approved engineering form for this stapled to stud below cut at eye level and in front of truss paperwork by fireplace with all plan material.
Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett/// needs some top plate straps, hardware for microlam supporting truss by garage entry,, ok to insulate
BLD-Wall cover3/20/20203/23/20203/23/2020APASS
DetailsTell Riley
Craig Phone #: ###-####//shear// wall bracing//ok when all nails and staples added//
BLD-Foundation2/2/20202/3/20202/3/2020APASS
DetailsTony Young
Foundation wall inspection. Thank you! Phone #: ###-#### Inspection requested via web by Craig Hammett
BLD-Footing1/29/20201/30/20201/30/2020APASS
DetailsBrandon Shaw
Work in progress...
Issue PAID IN FULL permit  1/16/2020 DONE
Inspection Record Card- Bld  1/16/2020 DONE
OVERRIDE  11/25/2019  
Plan assigned to (D_S) Debbie11/12/201911/12/201911/25/2019 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK11/25/2019 11/25/2019 PASS
DetailsJenny Nelson
Per D_S review
PLANS/APPL TAKEN TO FRONT DESK  11/25/2019 DONE
DetailsDebbie Sanine
Permit Ready to Issue  11/25/2019 DONE
Met
1st review completed  11/12/2019 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK10/2/2019 11/12/2019 FAIL
DetailsJenny Nelson
Per review with D_S.
Plan assigned to (RDP)10/2/201910/2/201911/8/2019 DEFR
DetailsRob Patrick
10/15 sdfd L1 ePlan
Route to Impact Fee Review10/2/201910/5/201910/3/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/2/2019 10/3/2019 PASS
DetailsTroy James
Routing - PLANNING10/2/2019 10/2/2019 PASS
DetailsSue Cummings
Routing - Addressing10/2/2019 10/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/2/2019 10/2/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/2/2019 DONE
Recd Pcfee & Taken To Pln CK  10/2/2019 DONE
Intake Approval  10/2/2019 PASS
Application received  9/30/2019 DONE
Application submitted via PDS Online on Sep 30 2019 4:09PM