Permit Information
Permit NumberBLD19-03901
StatusIssued
Name FORGE BUILDING COMPANY LLC
Site Address 3000 S WISE WAY
Project NameBarber Valley Storage
Customer NumberBLD19-03569,BLD19-03899-03902
ePlanReview 
Description
(BARBER VALLEY STORAGE) (FIVE PERMITS FILED UNDER BLD19-03569 IN EPLAN) (BUILDING #4) Permit is for Building #4 that totals 4,029 sqft. with 17 storage units. There is a total of 5 storage building areas located on a single parcel. The entire scope of work includes construction of 5 individual storage buildings with a total of 255 total storage units, a 285 sqft. retail office with 815 sqft. living quarters. This building is not fire sprinkled. Special inspections required per attached Form 310. Approval is contingent upon adhering to the approved plans on file, engineering, plan review reports, local codes and ordinances. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation7/10/20207/13/20207/13/2020APASS
DetailsMike Jordan
screened - stem wall / Jerrid Phone #: ###-####. East stemwall.
BLD-Foundation7/8/20207/8/20207/8/2020PPART
DetailsBrandon Shaw
Pending Special Inspection...
Issue PAID IN FULL permit  7/6/2020 DONE
Print Occupancy Form  7/6/2020 DONE
Telephone call  6/12/2020 DONE
emailed owner and cc'd contractor to let them know the fees have to be paid on the 03###-####2
Extend Review Timeline  6/1/2020 DONE
1st approved 180 day extension per joe. see documents
Telephone call  5/28/2020 DONE
sent jeff email about expired permits and may still request an extension
Permit Ready to Issue  5/20/2020 DONE
all met
NEED
ACHD inspections y/n

METNEED
ACHD: have receipt, just need doc that states whether inspections are required or not

MET Griffin Moeser
RP
GC
REVISED VALUE

met- Need GC
GC
REVISED VALUE
Routing PW Street Lights3/6/2020 5/19/2020 PASS
DetailsTom Marshall
Per BLD19-03569
Routing - PLAN CHECK5/19/2020 5/19/2020 PASS
DetailsMichael Hanson
Per BLD19-03569
PLANS/APPL TAKEN TO FRONT DESK  5/19/2020 DONE
DetailsMichael Hanson
Plan assigned to (M_H)10/11/2019 5/19/2020 DONE
DetailsMichael Hanson
2nd review completed - 11/07 #502 L3 ePlan - Barber Valley Storage
Routing PW Drainage3/6/2020 5/15/2020 PASS
DetailsBrian Murphy
Routing - Design Review5/12/2020 5/12/2020 PASS
DetailsKatelyn Menuge
Redlined retaining wall plus fence cannot not exceed 6 feet in height- C3 & C4
Routing PW Sewer Design3/6/2020 3/6/2020 PASS
DetailsDeAnn Brown
Routing - Design Review3/6/2020 3/6/2020 FAIL
DetailsKatelyn Menuge
Need updates to site plan, photometric plan, easements for awnings, current planning requirements.
Routing - PLANNING3/3/2020 3/3/2020 FAIL
DetailsDavid Moser
1) Need to submit a copy of the 17 foot easment from harris Ranch for Future Road street improvements.
2) Need to submit a copy of the approval/comment letter from harris ranch Review Board on the final design.
3) Provide sidewalk easement for sidewalk along Wise Way on private property
4) Provide cross access easement with property to the north for the emergency gate
Route to Impact Fee Review11/7/201911/10/201911/12/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - PLAN CHECK10/11/2019 11/7/2019 FAIL
DetailsMichael Hanson
See main permit BLD19-03569.
Routing Off Site - STRUCTURAL10/11/2019 11/7/2019 FAIL
DetailsMichael Hanson
See main permit BLD19-03569.
Routing PW Drainage10/14/2019 11/7/2019 FAIL
DetailsBrian Murphy
See main permit BLD19-03569.
Routing PW Street Lights10/14/2019 11/7/2019 FAIL
DetailsTom Marshall
See main permit BLD19-03569.
Routing - Erosion and Sediment10/11/2019 11/7/2019 PASS
DetailsMichael Zawacki
See main permit BLD19-03569.
Routing PW Solid Waste10/14/2019 11/7/2019 PASS
DetailsEvan Carpenter
See main permit BLD19-03569.
1st review completed  11/7/2019 FAIL
DetailsMichael Hanson
See main permit BLD19-03569.
Routing - FIRE10/11/201910/11/201911/6/2019 FAIL
DetailsMark Stumbaugh
See review comments for BLD19-03569
11/14 (502) Barber Valley Storage, ePlan
Routing PW Sewer Design10/14/2019 10/16/2019 FAIL
DetailsDeAnn Brown
Sheet labeled and submitted as DWG_C3_BVSS_GD&U is actually sheet C2 the horizontal control plan. Please resubmit and include sheet C3 (grading, drainage, and utilities).
Routing - Design Review10/11/2019 10/16/2019 FAIL
DetailsKatelyn Menuge
Upload Idaho Power approval, photometric plan, lighting plan for inside the storefront corridors and a plan for what will be placed in these areas, HRRB comments on final design and any written waivers by the HRRB per DR conditions. Awnings extending over property lines shall be placed within easements. See current planning comments for additional required documents.
Routing - Addressing10/11/2019 10/14/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/11/2019 10/14/2019 PASS
DetailsMorgan Webb
Routing - PLANNING10/11/2019 10/11/2019 FAIL
DetailsDavid Moser
* Need to submit a Staff Level Floodplain Review since the site is located in the 100 year floodplain as per the new FEMA maps.

* Need to submit a copy of the 17 foot easment from harris Ranch for Future Road street improvements. Also need approval/comment letter from harris ranch Review Board on the final design.

*provide sidewalk easement for sidewalk along Wise Way on private property

* Provide cross access easement with property to the north for the emergency gate* Need to submit a Staff Level Floodplain Review since the site is located in the 100 year floodplain as per the new FEMA maps.

* Need to submit a copy of the 17 foot easment from harris Ranch for Future Road street improvements. Also need approval/comment letter from harris ranch Review Board on the final design.

*Provide sidewalk easement for sidewalk along Wise Way on private property

* Provide cross access easement with property to the north for the emergency gate
Intake Approval  10/4/2019 PASS
Application received 10/1/2019