Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03905
StatusIssued
Name KB FINANCIAL LLC
Site Address 2330 W HILL TERRACE LN
Project NameNORTH HILL SUBDIVISION
Customer NumberBLD19-03905 - 03908
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** (FOUR PERMITS IN EPLAN UNDER BLD19-03905) (TOWN HOME PHASE 3)Permit for the construction of a new 1500 sq. ft., 2 story (second story 1500 sq. ft.) Townhouse with 2 bedrooms, 2 bathrooms, approximately a 668 sq. ft. attached garage on the first story per the approved plans and any notations. R-1C zoning and setbacks per planning. ***Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/31/20208/3/20208/3/2020APASS
DetailsTony Young
need to discuss entry stairway. please text approximately an hour ahead of time as I would like framer and concrete subs present Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Conference7/29/20207/31/20207/31/2020ADONE
DetailsTony Young
need to discuss entry stairway. please text approximately an hour ahead of time as I would like framer and concrete subs present Phone #: ###-#### Inspection requested via web by ron beckman
BLD-Wall Bracing7/17/20207/20/20207/21/2020APART
DetailsDave Hannah
Shear Inspection Phone #: ###-#### Inspection requested via web by ron beckman ext wall nailing ok needs to install hold downs on back wall
BLD-Conference7/13/20207/14/20207/14/2020APART
DetailsTony Young
party wall under front gables Phone #: ###-#### Inspection requested via web by ron beckman// work in progress,, ok
BLD-Conference7/1/20207/1/20207/1/2020PPASS
DetailsTony Young
Party Wall Inspection Phone #: ###-#### Inspection requested via web by ron beckman// 2nd floor
BLD-Conference6/12/20206/15/20206/15/2020APART
DetailsTony Young
party wall inspection Phone #: ###-#### Inspection requested via web by ron beckman// main level ok
BLD-Conference6/1/20206/2/20206/4/2020PPASS
DetailsTony Young
Ron Phone #: ###-####//
BLD-Conference6/2/20206/3/20206/3/2020APART
DetailsTony Young
Ron Phone #: ###-####// pony wall interior fire wall ok on all units
Plan Reviewer's activity  5/5/2020 DONE
DetailsJenny Nelson
Talked with contractor about 4' lay down parapet on either side of partywall - R302.2.2 Parapets is not required where approved fire-retardant treated wood for a distance of 4 feet on each side of the wall is used. Using fire retardant treated plywood for 4' on either side of party wall is ok. JJN
PubWorks Subgrade Approval4/23/20204/23/20204/23/2020 DONE
DetailsMelissa Jannusch
*Upper rear half of tounhouse* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing3/9/20203/9/20203/9/2020PPASS
DetailsTony Young
Ron Phone #: ###-####
PubWorks Subgrade Approval3/9/20203/9/20203/9/2020 DONE
DetailsMelissa Jannusch
Lower level footings. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  11/22/2019  
Inspection Record Card- Bld  11/22/2019 DONE
OVERRIDE  11/4/2019  
Plan assigned to (J_N)10/3/201910/3/201911/4/2019 DONE
DetailsJenny Nelson
10/22 townhomes ePlan. 1st complete 10/21, failed hillside
PLANS/APPL TAKEN TO FRONT DESK  11/4/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/4/2019 DONE
Routing PW Grading-Hillside10/21/2019 10/28/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

1st review completed  10/21/2019 DONE
DetailsJenny Nelson
Routing - PLANNING10/3/2019 10/21/2019 PASS
DetailsLeon Letson
Routing - PLAN CHECK10/3/2019 10/18/2019 PASS
DetailsJenny Nelson
Routing - Erosion and Sediment10/3/2019 10/9/2019 PASS
Details
Phase of existing town home project.
Route to Impact Fee Review10/3/201910/6/201910/4/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE10/3/201910/3/201910/4/2019 PASS
DetailsLee G Meredith
Fire code review passed. No comments. No sprinkelrs required.
Routing PW Grading-Hillside10/4/2019 10/4/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - Addressing10/3/2019 10/4/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/3/2019 10/4/2019 PASS
DetailsMorgan Webb
Routing - MECHANICAL10/3/2019 10/4/2019 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  10/3/2019 DONE
Recd Pcfee & Taken To Pln CK  10/3/2019 DONE
Intake Approval  10/3/2019 PASS
Intake Approval  10/2/2019 FAIL
1. The Manual J's are missing for 2334 and 2330 (Two of the ones that were uploaded were for the wrong addresses or a duplicate)
2.Please provide a ResCheck for each townhome or prescriptive method on the plans (if they are on the plans please let us know what sheet)
Intake Approval  10/2/2019 FAIL
10/2/19-still need 2 manual J's we have 2334 & 2330 Hill Terrace CAN
Application received  10/1/2019 DONE
Application submitted via PDS Online on Oct 1 2019 9:30AM
Telephone call  10/1/2019 DONE
left a message for Ron informing him that bld19-03906 to 03908 work flow will be stoped and that all documents and plans can go under BLD19-03905,