BLD-Wall Bracing | 7/17/2020 | 7/20/2020 | 7/21/2020 | A | PART |
Dave Hannah
|
|
|
Shear Inspection Phone #: ###-#### Inspection requested via web by ron beckman ext wall nailing ok needs to install hold downs on back wall
|
BLD-Conference | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | PART |
Tony Young
|
|
|
party wall under front gables Phone #: ###-#### Inspection requested via web by ron beckman// work in progress,, ok
|
BLD-Conference | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Tony Young
|
|
|
Party Wall Inspection Phone #: ###-#### Inspection requested via web by ron beckman// 2nd floor ok
|
BLD-Conference | 6/12/2020 | 6/15/2020 | 6/15/2020 | A | PART |
Tony Young
|
|
|
party wall inspection Phone #: ###-#### Inspection requested via web by ron beckman// main level ok
|
PubWorks Subgrade Approval | 4/23/2020 | 4/23/2020 | 4/23/2020 | | DONE |
Melissa Jannusch
|
|
|
*Upper rear half of tounhouse* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
PubWorks Subgrade Approval | 3/9/2020 | 3/9/2020 | 3/9/2020 | | DONE |
Melissa Jannusch
|
|
|
Lower level footings. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 11/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/3/2019 | 10/3/2019 | 11/4/2019 | | DONE |
Jenny Nelson
|
|
|
10/22 townhomes ePlan. 1st complete 10/21, failed hillside
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/4/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 10/21/2019 | | 10/28/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 10/21/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - Erosion and Sediment | 10/3/2019 | | 10/21/2019 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC19-01401 for site
|
Routing - PLANNING | 10/3/2019 | | 10/21/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 10/3/2019 | | 10/18/2019 | | PASS |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 10/3/2019 | 10/6/2019 | 10/4/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 10/3/2019 | 10/3/2019 | 10/4/2019 | | PASS |
Lee G Meredith
|
|
|
Fire code review passed. No comments. No sprinkelrs required.
|
Routing PW Grading-Hillside | 10/4/2019 | | 10/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - MECHANICAL | 10/3/2019 | | 10/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 10/3/2019 | | 10/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/3/2019 | | 10/4/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 10/2/2019 | | FAIL |
|
|
|
1. The Manual J's are missing for 2334 and 2330 (Two of the ones that were uploaded were for the wrong addresses or a duplicate)
2.Please provide a ResCheck for each townhome or prescriptive method on the plans (if they are on the plans please let us know what sheet)
|
Intake Approval | | | 10/2/2019 | | FAIL |
|
|
|
10/2/19-still need 2 manual J's we have 2334 & 2330 Hill Terrace CAN
|
Application received | | | 10/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2019 9:46AM
|
Telephone call | | | 10/1/2019 | | DONE |
|
|
|
left a message for Ron informing him that bld19-03906 to 03908 work flow will be stoped and that all documents and plans can go under BLD19-03905,
|