BLD-Final | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Brandon Shaw
|
|
|
Tyler Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Tell Riley
|
|
|
Tyler Phone #: ###-####//ok to insulate//
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Brandon Shaw
|
|
|
TIM Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/8/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 10/1/2019 | 10/1/2019 | 10/7/2019 | | PASS |
Josh Bogle
|
|
|
10/04 sunroom, paper
|
Routing - PLAN CHECK | 10/1/2019 | | 10/7/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/7/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2019 | | DONE |
Josh Bogle
|
|
|
ESc no - Energy no
|
Permit Ready to Issue | | | 10/7/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 10/7/2019 | | DONE |
|
|
|
Left voicemail for Bill to inform him the permit is ready and what fees are due.
|
Routing Walk-In (Zoning) | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Routing PW Flood Plain | 10/1/2019 | | 10/1/2019 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Application received | | 10/1/2019 | | | |
|
|
|
|