BLD-Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
|
FIRE-Final Inspection | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | CANC |
Jim Page
|
|
|
Point of contact cancelled inspection due too exit sign not placed, inspection will be rescheduled after exit sign is placed.
Inspection requested via web by rick pew
|
BLD-Wall cover | 1/31/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by rick pew
|
BLD-Ceiling Grid Inspection | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
FIRE-Conference | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Rick Phone #: ###-####
|
Route to Impact Fee Review | 12/13/2019 | 12/16/2019 | 12/13/2019 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (BJM) | 10/29/2019 | 10/29/2019 | 12/13/2019 | | DONE |
Brian McGowan
|
|
|
11/08 L2 Stoel Rives 20th Floor Remodel ePlan
|
Routing - PLAN CHECK | 10/29/2019 | | 12/13/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 12/13/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/13/2019 | | DONE |
|
|
|
ALL MET NEED
GC
Revised Certificate of Value
|
Issue PAID IN FULL permit | | | 12/13/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/13/2019 | | DONE |
|
|
|
|
Routing - Addressing | 10/29/2019 | | 10/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2019 | | 10/29/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 10/28/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/9/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following for your prescreen to be approved:
1. Provide a completed and signed Form #304.
|
Intake Approval | | | 10/3/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following for your prescreen to be approved:
1. Provide a completed Submittal Checklist and the documents and information required for your project.
2. Plan drawings must be individually uploaded.
|
Application received | | | 10/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2019 3:02PM
|