BLD-Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
BRANDY Phone #: ###-####
|
DOC - Permit Finaled | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | DONE |
Tell Riley
|
|
|
Call 15 mins berfore- Travis Phone #: ###-####
|
BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | FAIL |
Tell Riley
|
|
|
Brandy Phone #: ###-####//CN posted//need to add anchors on south end per engineering//
|
BLD-Footing | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
Brandy Phone #: ###-####
|
BLD-Conference | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | DONE |
Tell Riley
|
|
|
Call 15 mins before-Travis Phone #: ###-####//travis will try to get engineering changed or will add footings as per plan//
|
BLD-Footing | 10/18/2019 | 10/21/2019 | 10/21/2019 | P | FAIL |
Tell Riley
|
|
|
Brandy Phone #: ###-####//frost depth foundation needs to be on all 4 sides of building as displayed on sheet 3 of 6 on the approved engineered plans//
|
BLD-Footing | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | FAIL |
Tell Riley
|
|
|
Brandy Phone #: ###-####//pans show turned down continuous footings for foundaiton//piers were dug and do not reflect enginneering//
|
Routing Walk-In (Zoning) | 10/2/2019 | 10/2/2019 | 10/2/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/2/2019 | 10/2/2019 | 10/2/2019 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/2/2019 | | 10/2/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/2/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/2/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/2/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/2/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/2/2019 | | DONE |
|
|
|
|
Application received | | 10/2/2019 | | | |
|
|
|
|