Third Notice | | 7/13/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020 WITH SECOND LETTER
|
Second Follow up | | | 8/11/2020 | | DONE |
|
|
|
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
MAILED 7-9-2020 WITH FIRST FOLLOW UP
|
First Follow up | | | 7/8/2020 | | DONE |
|
|
|
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Second Notice | | 2/17/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | | 2/3/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
Telephone call | | | 1/24/2020 | | DONE |
|
|
|
Spoke with Tish G, Joe B and Jim P, ok to give permanent occupancy since the fire alarm permit is for the whole building.
|
Permanent Occupancy | | | 1/24/2020 | | DONE |
|
|
|
|
BLD-Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
|
FIRE-Final Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, fire sprinkler inspection is complete, a full fire alarm replacement is issued for this building under FIR19-00522, will verify fire alarm coverage during the final inspection for mentioned FIR permit, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Final fire after sprinklers have been removed. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
|
FIRE-Final Inspection | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | FAIL |
Jim Page
|
|
|
2 areas have fire sprinklers that are less than 6 feet apart, fire sprinkler modifications are required for area of work to be compliant with NFPA13. Any and all fire sprinkler modifications requires a seperate permit.
are will be onsite after 9am. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann
|
BLD-Framing/Rough-in | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PART |
Tony Young
|
|
|
Combining of Suites 201 and 205. Phone #: ###-#### Inspection requested via web by Kirsten Dallmann// walls ok after bracing tops per plan
|
Print Occupancy Form | | | 11/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/4/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/16/2019 | 10/16/2019 | 10/24/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 10/21 L1 Great West Engineering Ste 201 ePlan
|
Routing - PLAN CHECK | 10/24/2019 | | 10/24/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
all met: kirsten@sawtoothdevelopment.com
Need GC
Need Rev Val
|
Route to Impact Fee Review | 10/22/2019 | 10/25/2019 | 10/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/22/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 10/16/2019 | | 10/22/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Addressing | 10/16/2019 | | 10/16/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/16/2019 | | 10/16/2019 | | PASS |
Morgan Webb
|
|
|
CREDIT FOR DEMO NO NEW FEES
|
Intake Approval | | | 10/15/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/9/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following in order for your prescreen to be approved:
1. Sheet A1 and A2- The entire proposed tenant space is not shown. Please provide the entire space on these sheets.
|
Intake Approval | | | 10/3/2019 | | FAIL |
Brian McGowan
|
|
|
Please address or provide the following in order for your prescreen to be approved:
1. Provide a more detailed Key Plan so exiting can be verified from the proposed tenant space.
2. Sheet A1- The entire proposed tenant space is not shown. Please provide the entire space.
3. Sheet A1- Rooms need to be labeled for proposed use with square footage.
4. A2- No notes were provided for the Reflective Ceiling callouts.
|
Application received | | | 10/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2019 10:08AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|