BLD-Final | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Brandon Shaw
|
|
|
screened // Jeff Phone #: ###-####
|
DOC - Permit Finaled | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/1/2020 | 7/1/2020 | 7/1/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.3
|
BLD-Final | 6/26/2020 | 6/30/2020 | 6/30/2020 | P | CANC |
Brandon Shaw
|
|
|
Jeff *screened* Phone #: ###-####
|
PubWorks Occupancy Approval | 6/30/2020 | 6/30/2020 | 6/30/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Final | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | NR |
Mike Jordan
|
|
|
screened // Jeff Phone #: ###-####. Needs public works and zoning final?
|
Zoning Approval | 6/26/2020 | 6/26/2020 | 6/26/2020 | | PASS |
David Moser
|
|
|
|
BLD-Energy code compliance | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | NR |
Brandon Shaw
|
|
|
Need fire....
|
BLD-Energy code compliance | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | NR |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | NR |
Mike Jordan
|
|
|
Call to meet // Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | FAIL |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Needs to remove tyvek for wall bracing inspection. Need to verify drag trusses on roof nailing. it is ok to spray ceiling roof deck with the 3 inches of closed cell spray insulation, install fir sprinklers. Will also need to complete foam seal prior to framing inspection..Also noted the the tung and groove material that is going to used on soffits requires Romeo Gervais or Ron Johnsons approval from the fire dpt.
|
BLD-Footing | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PART |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PASS |
Brandon Shaw
|
|
|
South and East walls... Work in progress...
|
PubWorks Subgrade Approval | 11/1/2019 | 11/1/2019 | 11/1/2019 | | DONE |
Melissa Jannusch
|
|
|
*Entire south and east house wall including exterior driveway retaining wall*
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 10/31/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/31/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2019 | | DONE |
|
|
|
NEED
RP
|
Plan assigned to (J_N) | 10/9/2019 | 10/9/2019 | 10/30/2019 | | DONE |
|
|
|
10/28 sfd L2 ePlan. 1st complete 10/22, code year, failed hillside
|
Routing PW Grading-Hillside | 10/25/2019 | | 10/30/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 10/30/2019 | | 10/30/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 10/25/2019 | | 10/25/2019 | | FAIL |
Jenny Nelson
|
|
|
need code year updated
|
1st review completed | | | 10/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 10/9/2019 | | 10/22/2019 | | FAIL |
Jenny Nelson
|
|
|
Code year
|
Routing PW Grading-Hillside | 10/10/2019 | | 10/21/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - MECHANICAL | 10/9/2019 | | 10/14/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 10/9/2019 | 10/9/2019 | 10/11/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinkelr system is required and being provided by applicant.
|
Routing - Erosion and Sediment | 10/9/2019 | | 10/11/2019 | | PASS |
Andy J. Long
|
|
|
|
Route to Impact Fee Review | 10/9/2019 | 10/12/2019 | 10/10/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 10/9/2019 | | 10/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/9/2019 | | 10/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/9/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/9/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 10/9/2019 | | 10/9/2019 | | PASS |
David Moser
|
|
|
|
Routing - PLANNING | 10/9/2019 | | 10/9/2019 | | DONE |
Sue Cummings
|
|
|
Sent to David Moser
|
Intake Approval | | | 10/8/2019 | | FAIL |
|
|
|
(HILLSIDE PRESCREEN APPROVED - DO NOT RESEND FOR PRESCREEN) 2nd building prescreen failed - Correct address on RESCheck to reflect correct project address OR specify compliance with the Prescriptive method shown on plans. Additional option for energy code compliance is to provide Energy Rating Index (ERI).
|
Routing Walk-In (BLD) | 10/7/2019 | 10/7/2019 | 10/7/2019 | A | FAIL |
Michael Hanson
|
|
|
Provided information to applicant about a possible foundation only permit.
|
Intake Approval | | | 10/4/2019 | | FAIL |
|
|
|
Please upload most recent grading and drainage plans, full geotechnical engineering report, and geotechnical site suitability letter.
also please change the address on the res check, it doesn't match the address on the permit. Please leave the bottom right corner empty for our approval stamp
|
Application received | | | 10/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 2 2019 12:44PM
|