Permit Information
Permit NumberBLD19-03943
StatusFinaled
Name ANDREA WHITE
Site Address 2999 N LAKEHARBOR LN Unit: STE 110
Project NameFattitude- Idaho Athletic Club
Customer Number 
ePlanReviewNo
Description
(FATTITUDE- IDAHO ATHLETIC CLUB- SUITE 110) Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 1,830 sq. f.t existing restaurant tenant. This space was previously occupied by "Club Cafe' or Palma Cafe' under BLD02-02785. Existing plumbing/faucets are being replaced as needed for calcium deposits (a separate Plumbing Permit is required). NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. NOTE: This building is fully fire sprinklered for one-hour substitution. (PC#0724-02) **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/201911/5/201911/5/2019PPASS
DetailsTony Young
Desiree Phone #: ###-####
FIRE-Final Inspection11/4/201911/5/201911/5/2019APASS
DetailsJim Page
Previously noted items have been corrected, final fire sprinkler inspection is complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work is complete.

Desiree Phone #: ###-####
Permanent Occupancy  11/5/2019 DONE
FIRE-Final Inspection10/23/201910/24/201910/24/2019AFAIL
DetailsJim Page
Two pendant fire sprinklers are still in place from where a ceiling has been removed, sprinkler heads mentioned need to be removed and plugged, a seperate permit is required for any and all fire sprinkler modifications. Provide annual inspection for fire extinguisher that is in space. Provide a maximum occupancy sign with the correct number of occupants based on city approved documents.

Andy Phone #: ###-####
BLD-Final10/23/201910/24/201910/24/2019PCANC
DetailsTony Young
CANCEL Andy Phone #: ###-####
Issue PAID IN FULL permit  10/21/2019 DONE
(F) Reprint permit  10/21/2019 DONE
(F) Reprint permit  10/21/2019 DONE
Plan assigned to (BJM)10/2/2019 10/7/2019 DONE
DetailsBrian McGowan
10/07- Occupancy
Routing - PLAN CHECK10/2/2019 10/7/2019 PASS
DetailsBrian McGowan
1st review completed  10/7/2019 DONE
DetailsBrian McGowan
Case Summary (BLD)  10/7/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  10/7/2019 DONE
DetailsBrian McGowan
Print Occupancy Form  10/7/2019 DONE
Permit Ready to Issue  10/7/2019 DONE
Met
Print Occupancy Form  10/7/2019 DONE
Telephone call  10/7/2019 DONE
Spoke with Andrea to inform her that the permit is ready to pick up.
Routing - PUBLIC WORKS10/2/2019 10/4/2019 PASS
DetailsMorgan Webb
Routing - Addressing10/2/2019 10/3/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  10/2/2019 DONE
Recd Pcfee & Taken To Pln CK  10/2/2019 DONE
Intake Approval  10/2/2019 PASS
First Notice 11/15/2019   
Application received 10/2/2019