Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03954
StatusFinaled
Name FRAME CONSTRUCTION INC
Site Address 11713 W ALFRED CT
Project NameVilliers PV Array
Customer Number 
ePlanReviewYes
Description
Permit for 280sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 16 panels in 2 arrays tying into a SquareD panel. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/7/201911/8/201911/8/2019APASS
DetailsTell Riley
Please call ###-#### for Karl. Phone #: ###-#### Inspection requested via web by Coulton Main//final electrical complete--install ok per approved plans//
DOC - Permit Finaled11/8/201911/8/201911/8/2019PPASS
DetailsTell Riley
Issue PAID IN FULL permit  10/14/2019 DONE
Inspection Record Card- Bld  10/14/2019 DONE
Telephone call  10/14/2019 DONE
Emailed permit to be signed to- chad@synergypowerpv.com Eplan will need to be release
Routing - PLAN CHECK10/3/2019 10/10/2019 PASS
DetailsJosh Bogle
1st review completed  10/10/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/10/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  10/10/2019 DONE
met
Plan assigned to (JAB) Josh10/3/201910/3/201910/4/2019 DONE
DetailsJosh Bogle
10/09 PV, ePlan
Application received  10/3/2019 DONE
Application submitted via PDS Online on Oct 3 2019 8:32AM
VOIDED CHANGE STATUS  10/3/2019 DONE
No ESC Required for roof solar panels
CHANGE STATUS TO (REV)  10/3/2019 DONE
Didn't mean to void this BLD, the ESC attached is voided.
Plans ACCEPTED BY PLAN TECH  10/3/2019 DONE
Recd Pcfee & Taken To Pln CK  10/3/2019 DONE
no fee taken at intake, 406
Intake Approval  10/3/2019 PASS
Routing - PLANNING10/3/2019 10/3/2019 PASS
DetailsSue Cummings