BLD-Energy code compliance | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Jim Storey
|
|
|
screened // Davin Phone #: ###-####
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Jim Storey
|
|
|
Davin **cleared** Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/27/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/22/2020 | 4/22/2020 | 4/23/2020 | | PASS |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 4/23/2020 | | DONE |
|
|
|
Floor plan and ES changes proposed.
Originally submitted as paper, please stamp all ePlanReview files when approved
|
Routing - PLAN CHECK | 4/23/2020 | | 4/23/2020 | | PASS |
Josh Bogle
|
|
|
1hr Plan Review
|
Permit Ready to Issue | | | 4/23/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
BLD-Framing/Rough-in | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PART |
Jim Storey
|
|
|
Davin Phone #: ###-#### hard wire sd/ support floor joist at stair at access opening/ insulate attic spaces at vault. ok to insulate.
|
Routing Walk-In (BLD) | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Josh Bogle
|
|
|
discussed possible engineering changes
|
BLD-Footing | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Jim Storey
|
|
|
Annie Phone #: ###-####
|
Route to Impact Fee Review | 11/14/2019 | 11/17/2019 | 11/15/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Route to Impact Fee Review | 11/14/2019 | 11/19/2019 | 11/14/2019 | | PASS |
Travis P Black
|
|
|
|
Issue PAID IN FULL permit | | | 11/14/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/22/2019 | 10/22/2019 | 11/13/2019 | | PASS |
Josh Bogle
|
|
|
10/28 ADU, paper - 1st done
|
Routing - PLAN CHECK | 11/13/2019 | | 11/13/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/13/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/13/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 11/13/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/12/2019 | | DONE |
|
|
|
2 large sets of plans- Floor plans and Structural plans- Taken to Josh
|
Routing - MECHANICAL | 10/23/2019 | | 10/25/2019 | | PASS |
Chad Schwendiman
|
|
|
Ductless System
|
Routing - Addressing | 10/3/2019 | | 10/23/2019 | | PASS |
Doug Chausow
|
|
|
ADU address: 1202 W Howard St
|
Routing - PUBLIC WORKS | 10/3/2019 | | 10/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing Walk-In (BLD) | 10/22/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Routing Walk-In (BLD) | 10/3/2019 | 10/3/2019 | 10/3/2019 | A | FAIL |
Josh Bogle
|
|
|
documentation problems - applicant will resubmit after redrawing
|
1st review completed | | | 10/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/3/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/3/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 10/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 10/3/2019 | | 10/3/2019 | | PASS |
Sue Cummings
|
|
|
per CAA19-00218
|
Application received | | 10/3/2019 | | | |
|
|
|
|