Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-03963
StatusIssued
Name ASIN GENERAL CONTRACTORS
Site Address 5391 N EUGENE STREET
Project NameGreiner Residence
Customer NumberADU BLD19-04133
ePlanReviewYes
Description
***Per Leon, customer should have recorded deed restriction and final approval from irrigation company as part of their documents in eplan*** Permit for the construction of a new 1456 sq. ft., two story (first story 561 sq. ft., second story 895 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 291 sq. ft. of covered patio/porch and a 655 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation8/4/20208/4/20208/4/2020PPART
DetailsTony Young
Jose ###-####
BLD-Foundation8/3/20208/4/20208/4/2020ANR
DetailsTony Young
Jose
BLD-Footing7/31/20208/3/20208/3/2020APASS
DetailsTony Young
Jose Phone #: ###-####
BLD-Footing7/31/20207/31/20207/31/2020PNR
DetailsTony Young
Jose Phone #: ###-####
BLD-Footing7/30/20207/31/20207/31/2020ANR
DetailsTony Young
Jose Phone #: ###-####
Issue PAID IN FULL permit  7/10/2020 DONE
Inspection Record Card- Bld  7/10/2020 DONE
OVERRIDE  7/8/2020  
Plan assigned to (BJM)4/28/20204/28/20207/8/2020 DONE
DetailsBrian McGowan
07/08- 2nd Review Complete- 05/19- SFD
Routing - PLAN CHECK7/8/2020 7/8/2020 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  7/8/2020 DONE
DetailsBrian McGowan
Permit Ready to Issue  7/8/2020 DONE
MET
Routing - PLANNING4/28/2020 6/19/2020 PASS
DetailsLeon Letson
Extend Review Timeline  6/15/2020 DONE
1st approved 180 extension per joe. see documents
1st review completed  6/12/2020 DONE
DetailsBrian McGowan
Routing - PLAN CHECK4/28/2020 6/12/2020 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  5/28/2020 DONE
DetailsBrian McGowan
Emailed Scott to see what files should be deleted from the drawing file. All the older files were still there and did not Version over.
Route to Impact Fee Review4/28/20205/1/20204/29/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL4/28/2020 4/29/2020 PASS
DetailsTroy James
Routing - FRONT DESK4/28/2020 4/28/2020 DONE
DetailsSue Cummings
Sent to Leon
Intake Approval  4/28/2020 PASS
Plans ACCEPTED BY PLAN TECH  4/28/2020 DONE
Routing - Addressing4/28/2020 4/28/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/28/2020 4/28/2020 PASS
DetailsCandy A. Nichols
Intake Approval  10/28/2019 FAIL
2nd prescreen: Please refer to ePlanReview Standards - https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
1. Move the "Designed by Jo" stamp - to comply with ePlan Standards (it is where the city stamp will be) - See page 6
2. Rename sheets according to ePlan Standards. See page 6
Intake Approval  10/18/2019 FAIL
Please refer to ePlanReview Standards - https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
1. Move the "Designed by Jo" stamp - to comply with ePlan Standards (it is where the city stamp will be) - See page 6
2. Rename sheets according to ePlan Standards. See page 6
3. Provide ACCA report on HVAC system - see page 2 of the Submittal Checklist (required) - https://www.cityofboise.org/media/7086/402-new-residential-submittal-checklist.

Emailed the Scott to let him know that per Leon, customer should have recorded deed restriction and final approval from irrigation company as part of his documents in eplan
Application received  10/3/2019 DONE
Application submitted via PDS Online on Oct 3 2019 2:09PM
Telephone call  10/3/2019 DONE
Left a message for Scott informing him that this parcel will not be approved by planning for a home