BLD-Foundation | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | PART |
Tony Young
|
|
|
Jose ###-####
|
BLD-Foundation | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | NR |
Tony Young
|
|
|
Jose
|
BLD-Footing | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | PASS |
Tony Young
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 7/31/2020 | 7/31/2020 | 7/31/2020 | P | NR |
Tony Young
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | NR |
Tony Young
|
|
|
Jose Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/8/2020 | | |
|
|
|
|
Plan assigned to (BJM) | 4/28/2020 | 4/28/2020 | 7/8/2020 | | DONE |
Brian McGowan
|
|
|
07/08- 2nd Review Complete- 05/19- SFD
|
Routing - PLAN CHECK | 7/8/2020 | | 7/8/2020 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/8/2020 | | DONE |
|
|
|
MET
|
Routing - PLANNING | 4/28/2020 | | 6/19/2020 | | PASS |
Leon Letson
|
|
|
|
Extend Review Timeline | | | 6/15/2020 | | DONE |
|
|
|
1st approved 180 extension per joe. see documents
|
1st review completed | | | 6/12/2020 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/28/2020 | | 6/12/2020 | | FAIL |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 5/28/2020 | | DONE |
Brian McGowan
|
|
|
Emailed Scott to see what files should be deleted from the drawing file. All the older files were still there and did not Version over.
|
Route to Impact Fee Review | 4/28/2020 | 5/1/2020 | 4/29/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 4/28/2020 | | 4/29/2020 | | PASS |
Troy James
|
|
|
|
Routing - FRONT DESK | 4/28/2020 | | 4/28/2020 | | DONE |
Sue Cummings
|
|
|
Sent to Leon
|
Intake Approval | | | 4/28/2020 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/28/2020 | | DONE |
|
|
|
|
Routing - Addressing | 4/28/2020 | | 4/28/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2020 | | 4/28/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 10/28/2019 | | FAIL |
|
|
|
2nd prescreen: Please refer to ePlanReview Standards - https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
1. Move the "Designed by Jo" stamp - to comply with ePlan Standards (it is where the city stamp will be) - See page 6
2. Rename sheets according to ePlan Standards. See page 6
|
Intake Approval | | | 10/18/2019 | | FAIL |
|
|
|
Please refer to ePlanReview Standards - https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
1. Move the "Designed by Jo" stamp - to comply with ePlan Standards (it is where the city stamp will be) - See page 6
2. Rename sheets according to ePlan Standards. See page 6
3. Provide ACCA report on HVAC system - see page 2 of the Submittal Checklist (required) - https://www.cityofboise.org/media/7086/402-new-residential-submittal-checklist.
Emailed the Scott to let him know that per Leon, customer should have recorded deed restriction and final approval from irrigation company as part of his documents in eplan
|
Application received | | | 10/3/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 3 2019 2:09PM
|
Telephone call | | | 10/3/2019 | | DONE |
|
|
|
Left a message for Scott informing him that this parcel will not be approved by planning for a home
|