Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-03969
StatusIssued
Name HC COMPANY INC
Site Address 7155 W DENTON ST
Project NameAAA Boise Remodel
Customer Number 
ePlanReviewYes
Description
(AAA BOISE) ***PLAN MOD TO UTILIZE DIFFERENT ROOFING MATERIAL AT LOBBY UPDATED STRUCTURAL AND MECHANICAL SUBMITTALS*** MDH Permit to remodel an existing 14,270 sqft. office building to include a 1,585 sqft event space (A-3) in 3 phases. Work to include: Demo non-load bearings walls and finishes, construct non-load bearing walls, interior doors, millwork, (2) accessible restrooms, site work, roof replacement, exterior roof canopy extension, mechanical work, electrical work, and plumbing work. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Ceiling Grid Inspection8/11/20208/12/20208/12/2020APASS
DetailsMike Jordan
Jason */Screened*/ Phone #: ###-####. Phase 2.
BLD-Framing/Rough-in6/30/20207/1/20207/1/2020APASS
DetailsJim Storey
screened // Cameron Phone #: ###-####
CHANGE STATUS TO (ISS)  6/30/2020 DONE
plan mod
Permit Ready to Issue  6/22/2020 DONE
PLAN MOD Met
Plan Modification Accepted  6/5/2020 DONE
deferred submittal
Plan assigned to (M_H)6/5/2020 6/5/2020 DONE
DetailsMichael Hanson
Routing - PLAN CHECK6/5/2020 6/5/2020 PASS
DetailsMichael Hanson
VERIFIED SKYLIGHTS MET THE REQUIRED U-VALUE AND SHGC REQUIREMENTS PER 2015 IECC TABLE C402.4.
PLANS/APPL TAKEN TO FRONT DESK  6/5/2020 DONE
DetailsMichael Hanson
FIRE-Final Inspection5/19/20205/19/20205/19/2020PPART
DetailsTroy Cobbley
Life safety passed for phase 2, west side of the building.

Jason *screened* Phone #: ###-####
BLD-Ceiling Grid Inspection5/14/20205/14/20205/14/2020PPASS
DetailsMike Jordan
Screened- Jason Phone #: ###-####. Phase 1 grid ok.
Routing - MECHANICAL5/11/2020 5/11/2020 PASS
DetailsChad Schwendiman
Telephone call  5/8/2020 DONE
Sent email to Willis, permit is ready pending fees paid
CHANGE STATUS TO (ISS)  5/8/2020 DONE
Permit Ready to Issue  5/7/2020 DONE
MET - updated 306 for plan mod
Plan assigned to (M_H)4/22/2020 5/5/2020 DONE
DetailsMichael Hanson
1st review plan mod complete 05/08 Plan Mod - AAA Boise
Routing Off Site - STRUCTURAL4/29/2020 5/5/2020 PASS
DetailsMichael Hanson
D. Haugland @ AHJ engineering
Routing - PLAN CHECK4/22/2020 4/22/2020 PASS
DetailsMichael Hanson
Plan Mod #1
Routing Off Site - STRUCTURAL4/8/2020 4/21/2020 PASS
DetailsMichael Hanson
Per D. Haugland @ AHJ engineering.
BLD-Ceiling Grid Inspection4/20/20204/20/20204/20/2020PNR
DetailsMike Jordan
SCREENED // JASON Phone #: ###-####. Mech rough in inspection has failed.
BLD-Ceiling Grid Inspection4/16/20204/16/20204/16/2020PNR
DetailsMike Jordan
Jason - no one is at the job site willing to do virtual Phone #: ###-####. Needs mech rough in inspection first.
Routing - Design Review4/8/2020 4/8/2020 PASS
DetailsKayCee Babb
Approval to replace fiberglass roofing with metal panel roofing and skylights. No other alterations are approved through this plan mod.
BLD-Ceiling Grid Inspection4/7/20204/7/20204/7/2020PNR
DetailsMike Jordan
screened willing to do video/phot // Jason Phone #: ###-####
Plan Modification Accepted  4/1/2020 DONE
**NEED 306** Willis DeWitt submitted a plan mod
Plan assigned to (M_H)4/1/2020 4/1/2020 DONE
DetailsGemma Flores
plan mod: Replacing the permitted translucent fiberglass sandwich panel roof structure in the lobby with a metal deck and skylight roof assembly. Sheets to be uploaded: G0.01, S0.01, S2.01, A1.03, A2.10, A3.01, A5.01, A5.07, A5.08, A6.10, A6.11, A6.12, and 6.13
BLD-Framing/Rough-in3/9/20203/9/20203/9/2020PPART
DetailsMike Jordan
Jason Phone #: ###-####. Interior steel stud framed walls and soffits for phase 1 construction. Pending electrical rough in inspection.
BLD-Framing/Rough-in3/5/20203/6/20203/6/2020APART
DetailsMike Jordan
Jason Phone #: ###-####. Interior steel stud framed walls and soffits in open office area phase 1. Needs electrical rough in inspection. Also needs to add missing screws in framing.
Meeting  1/7/2020 DONE
Emailed a reminder to the GC to please print and sign their name on the building permit and send it back.
Issue PAID IN FULL permit  1/3/2020 DONE
Print Occupancy Form  1/3/2020 DONE
Routing - PLAN CHECK12/30/2019 12/30/2019 PASS
DetailsMichael Hanson
Permit Ready to Issue  12/30/2019 DONE
all met: willis@woofterarchitecture.com

Need
GC Form
Revised Cert of Value
Plan assigned to (M_H)11/19/2019 12/30/2019 DONE
DetailsMichael Hanson
2nd review completed - 12/13 #520 L3 ePlan - AAA Boise
Routing - PLAN CHECK12/23/2019 12/23/2019 FAIL
DetailsMichael Hanson
See building plan review report for corrections required.
Route to Impact Fee Review12/12/201912/15/201912/12/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
Routing - FIRE11/19/201911/19/201912/12/2019 PASS
DetailsErika Akin
Attached comments to case
1st review completed  12/12/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK11/19/2019 12/11/2019 FAIL
DetailsMichael Hanson
See building plan review report for corrections required.
Routing - Addressing11/19/2019 11/20/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/19/2019 11/19/2019 PASS
DetailsMorgan Webb
WEST BOISE SEWER DISTRICT
Routing - Design Review11/19/2019 11/19/2019 PASS
DetailsKayCee Babb
Per CZC19-00262
Intake Approval  11/18/2019 PASS
DetailsJavier Guzman
Intake Approval  11/5/2019 FAIL
DetailsBrian McGowan
Many of the uploaded drawings do not provide the required space in the lower right hand corner for the City Approval Stamp as required.
Please resubmit sheets as needed to provide the required space.
Intake Approval  10/4/2019 FAIL
DetailsBrian McGowan
Please address or provide the following for your Prescreen to be approved:
1. Plan Sheets must be uploaded separately.
2. Mechanical, Electrical and Plumbing cannot be deferred without written approval from the Chief Inspector of that division.
3. Sheet A1.03 Keynote #3 mentions the manufacturer to verify and engineer structural framing sizes. All structural changes must be submitted with the drawings. Please include details, calculations and designs that are stamped and signed by a licensed Idaho Engineer.
Application received  10/3/2019 DONE
Application submitted via PDS Online on Oct 3 2019 6:37PM